PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 26 MAY 2015
Electricity and Telecommunication Services
24. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
25. Certification must be submitted to Council from all relevant service providers which certifies
that the development has met the requirements of this Decision Notice and all applicable
legislation at the time of construction.
Earthworks and Retaining Walls
26. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
27. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
28. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Advertising Devices
29. The development signage must comply with the Advertising Devices Code.
Environmental Health
30. The developer must provide waste storage and disposal facilities, including an external
imperviously paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is required with
a cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
outlet is to be designed to prevent storm water entry to the sewerage system. This can be
achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or
alternatively the waste area can be roofed, or any other design approved by Council.
31. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No.
9 Waste Management and Planning Scheme Policy 11, Waste Management Plans* must
be submitted for the day-to-day operation of the development and approved by Council’s
Waste and Environmental Health Section, prior to issue of development permit for
operational works. (*refer to Advisory Notes)
The Plan must include the following information: -
a. the types of wastes that will be generated from the activities approved within the
development
b. estimated volumes or tonnage of both recyclables and waste generated
c. methods to be used for dealing with garden waste
d. initiatives to minimize waste either by waste prevention, reduction, re-use or recycling
e. description of procedures for getting all waste to the bins; the storage of bins and the
collection of bins by the contractor
Page 46 of 171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.