PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 26 MAY 2015
31. Any proposed Community Management Statement required for the development
must include the Water by Design (2009) – Maintaining Vegetated Stormwater Assets
(Version 1) document and must include the full cost of maintaining the system in
accordance with that document.
Acid Sulfate Soils
32. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified person*
and referenced in a Development Permit for Operational Works. *(Refer to Advisory
Note)
Electricity and Telecommunication Services
33. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
34. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Undergrounding of Existing Overhead Powerlines
35. The existing overhead electricity connections to the site must be removed and any
new connection service must be provided underground.
Easements
36. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property. All easements must be designed in
accordance with the planning scheme and granted at no cost to the Grantee. Where
the Grantee is Council or a service authority, the easement documentation must be in
accordance with the Grantee’s standard easement terms.
37. Draft easement documentation must be submitted to Council for endorsement.
38. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
39. All fill and associated batters must be undertaken in accordance with an Operational
Works approval and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
40. Any damage caused to existing services and assets above or below the ground must
be repaired:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Page 9 of 171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.