Original source · versioned page text
SCG - 0315 - SD Issue 2 - 20.03.2025
·
·
·
·
··
··
··
·· A
A
B
C
D
E SITE PREPARATION & EARTHWORKS
1 2 3 B 4 5 6 THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 0315-N.
A SEWER DETAILS 20.03.2025
Revision Description Date
Issue:
TARGET FOUNDATION SOIL
DILAPIDATION REPORT:
Unit 1/11 Project Ave,
SCG HOLDINGS PTY LTD T/A
NATURAL MEDIUM DENSE/DENSE SAND Noosaville
100kPa Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
ABN 68 669 675 790
Title:
BASEMENT FOOTING AND
SLAB PLAN
Project
18 Nebula Street
Sunshine Beach
Rev. - 10.06.16
Date: Drg No. Rev.
Mar 2025 0315 - S1.1 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.