Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

SCG - 0315 - SD Issue 2 - 20.03.2025

of 20

Page text shows just the words. Original shows the document exactly as it was published.

A




B


C


D


                                                                                                                     SITE PREPARATION & EARTHWORKS




E




    1   2   3   B                        4                     5   6                      THIS DRAWING AND ASSOCIATED DETAILS
                                                                                          MUST BE READ IN CONJUNCTION WITH
                                                                                          THE NOTES CONTAINED ON 0315-N.


                                                                                                               .              .                                               .
                                                                                                                Revision      Description                                     Date

                                                                                                                     Issue:
                    TARGET FOUNDATION SOIL


                    NATURAL MEDIUM DENSE/DENSE SAND                                                                                                      Unit 1/11 Project Ave,




                                                                                          SCG HOLDINGS PTY LTD T/A
                                                                                                                                                         Noosaville
                                                      100kPa
                                                                                                                                                         Ph (07) 5455 5604
                                                                                                                                                         email:[email protected]
                                                                                                                                                         web:www.scg-engineers.com
                                                                                                                                                         ABN 68 669 675 790


                                                                                         Title:
                                                                                                                       FIRST FLOOR FOOTING PLAN

                                                                                         Project
                                                                                                                        18 Nebula Street
                                                                                                                        Sunshine Beach




                                                                       Rev. - 10.06.16
                                                                                         Date:                                          Drg No.                                      Rev.
                                                                                                                      Mar 2025                    0315               - S1.2           .
Log in to download the original file

SCG - 0315 - SD Issue 2 - 20.03.2025.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.