SITE PREPARATION & EARTHWORKS
E
1 2 3 B 4 5 6 THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 0315-N.
. . .
Revision Description Date
Issue:
TARGET FOUNDATION SOIL
NATURAL MEDIUM DENSE/DENSE SAND Unit 1/11 Project Ave,
SCG HOLDINGS PTY LTD T/A
Noosaville
100kPa
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
ABN 68 669 675 790
Title:
FIRST FLOOR FOOTING PLAN
Project
18 Nebula Street
Sunshine Beach
Rev. - 10.06.16
Date: Drg No. Rev.
Mar 2025 0315 - S1.2 .