Council archive · source document
Decision Notice OPW25 0057 · OPW25/0057
h. Protect and recover fauna during clearing operations (not previously removed).
i. Manage the translocation of animals and recovery procedures in accordance with
relevant legislation.
*(Refer to Advisory Note)
Plant Pest Management
59. A qualified person* must manage plant pest (weeds) to:
a. Ensure plants listed as Class 1 and 2 declared pests within Council’s Pest
Management Plan are controlled and prevented from spreading.
b. Oversee management techniques that minimise regrowth, prevent damage to non-
target species, retain conservation values and maintains site stability.
*(Refer to Advisory Note)
Landscaping Works
60. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice and must include in
particular:
a. Substitution of Ficus Obliqua with Syzygium leuhmannii
(* Refer to Advisory Note)
61. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
62. Landscape works must:
a. Ensure amenity or sales signage and ancillary infrastructure is not installed within the
road reserve.
b. Ensure permanent irrigation is not installed within the road reserve.
c. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of
foreign matter including anthropogenic waste, rock, soil/sediment contamination and is
applied to all planting areas to ensure a minimum 100mm depth once settled.
*(Refer to Advisory Notes)
63. Public amenity trees* must:
a. Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
*(Refer to Advisory Note)
64. Turfed areas must be must be free of pest, diseases and weeds and level with adjoining
surfaces.
FOLLOWING CONSTRUCTION / COUNCIL SIGNING THE PLAN OF SURVEY
Certification
65. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
As Constructed Plans and ADAC XML Files (Council)
66. Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
“As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
information shall include:
Page 13 of 20
Document Set ID: 24052669
Version: 2, Version Date: 22/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW25 0057.pdfRelated documentApplication case desk ↗
About this file
- File size
- 219 KB (small file)
- File type
No other editions are linked here.