Decision Notice OPW25 0057 · OPW25/0057

of 20

Text shows just the words. Original shows the document exactly as it was published.

                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods,
                      a.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods,
                      b.      Been revised to address predicted rainfall events, and
                      c.      Achieve the desired environmental outcomes.
               53.    Earthworks and the implementation of erosion and sediment controls are undertaken in ways
                      which ensure flooding characteristics (including stormwater quantity characteristics) external
                      to the development site are not worsened during construction for all events up to and
                      including the 1% AEP (1 in 100 year ARI) event.
               54.    Drainage paths must be regularly inspected to ensure the sediment fences/measures are not
                      being bypassed as a result of sediment build up. Sediment laden runoff must be prevented
                      from leaving the subject site and entering neighbouring properties and/or stormwater
                      systems.
               55.    Soil exposure must be limited on the site to a distance of no more than 2m beyond the extent
                      of earthworks shown on the approved plans except where the exposed soil is effectively
                      stabilised without delay and prior to rainfall occurring.
               56.    A log book for the Erosion and Sediment Control measures and inspections must be
                      maintained by the site manager and made readily available to Council when requested. The
                      supervising engineer must verify and endorsed the E&SC measures upon their installation,
                      and periodically check these measures and the log book during construction and the
                      stabilisation stages. Any defects in erosion and sediment control devices, such as sediment
                      fences, are to be inspected and documented. Upon Inspection, the contractor is to determine
                      whether the device should be replaced or repaired. Documentation is to include how the
                      damage was caused and what measures can be implemented to reduce the possibility of
                      repeat occurrences. Any damage to either permanent or temporary water quality control
                      structures or devices is to be immediately rectified at the contractor’s expense.
                      The effectiveness of the erosion and sediment control devices must be monitored. All ESC
                      measures are to be inspected:
                      a.      at least daily (when work is occurring on site) or weekly (when work is not occurring on
                              site); or
                      b.      within 24 hours of expected rain; or
                      c.      within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to
                              mobilise sediment on site).
                      Landscaping
                      Retention of Existing Trees and Vegetation
               57.    All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.

                      Fauna Management
               58.    A qualified person* must be engaged to manage fauna prior and during clearing to:
                      d.      Ensure works are carried out in accordance with the referenced Fauna Management
                              Plan J001343 dated Sept 2024; and the Nature Conservation Act 1992.
                      e.      Undertake pre-clearing inspections including fauna relocation and removal or blocking
                              of all vacant hollows.
                      f.      Ensure clearing works avoids nesting times of animals and birds.
                      g.      Co-ordinate staging and sequence of clearing with fauna protection.




                                                                                                        Page 12 of 20
Document Set ID: 24052669
Version: 2, Version Date: 22/08/2025

Used in these records

About this file

File size
219 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice OPW25 0057.pdf · 219 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.