a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods,
a. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods,
b. Been revised to address predicted rainfall events, and
c. Achieve the desired environmental outcomes.
53. Earthworks and the implementation of erosion and sediment controls are undertaken in ways
which ensure flooding characteristics (including stormwater quantity characteristics) external
to the development site are not worsened during construction for all events up to and
including the 1% AEP (1 in 100 year ARI) event.
54. Drainage paths must be regularly inspected to ensure the sediment fences/measures are not
being bypassed as a result of sediment build up. Sediment laden runoff must be prevented
from leaving the subject site and entering neighbouring properties and/or stormwater
systems.
55. Soil exposure must be limited on the site to a distance of no more than 2m beyond the extent
of earthworks shown on the approved plans except where the exposed soil is effectively
stabilised without delay and prior to rainfall occurring.
56. A log book for the Erosion and Sediment Control measures and inspections must be
maintained by the site manager and made readily available to Council when requested. The
supervising engineer must verify and endorsed the E&SC measures upon their installation,
and periodically check these measures and the log book during construction and the
stabilisation stages. Any defects in erosion and sediment control devices, such as sediment
fences, are to be inspected and documented. Upon Inspection, the contractor is to determine
whether the device should be replaced or repaired. Documentation is to include how the
damage was caused and what measures can be implemented to reduce the possibility of
repeat occurrences. Any damage to either permanent or temporary water quality control
structures or devices is to be immediately rectified at the contractor’s expense.
The effectiveness of the erosion and sediment control devices must be monitored. All ESC
measures are to be inspected:
a. at least daily (when work is occurring on site) or weekly (when work is not occurring on
site); or
b. within 24 hours of expected rain; or
c. within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to
mobilise sediment on site).
Landscaping
Retention of Existing Trees and Vegetation
57. All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
Fauna Management
58. A qualified person* must be engaged to manage fauna prior and during clearing to:
d. Ensure works are carried out in accordance with the referenced Fauna Management
Plan J001343 dated Sept 2024; and the Nature Conservation Act 1992.
e. Undertake pre-clearing inspections including fauna relocation and removal or blocking
of all vacant hollows.
f. Ensure clearing works avoids nesting times of animals and birds.
g. Co-ordinate staging and sequence of clearing with fauna protection.
Page 12 of 20
Document Set ID: 24052669
Version: 2, Version Date: 22/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW25 0057.pdfRelated documentApplication case desk ↗
About this file
- File size
- 219 KB (small file)
- File type
No other editions are linked here.