2018-11-12 General Committee Meeting Notes

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                  12 NOVEMBER 2018


    15.   An Arborist Report (or part thereof) prepared by a qualified person* and endorsed
          through an Operational Works approval must provide recommendations for the
          design of civil works, including retaining walls, to accommodate the retention of the
          Mango tree.
    16.   The Mango tree identified for retention in the conditions of this approval must be
          maintained in good health during construction and operational use for the expected
          life of the tree.
          *(Refer to Advisory Note)
    Landscaping Works
    17.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval and the Noosa Plan Planning
          Scheme Policy PSP 3 – Landscaping Plants and Guidelines and must include in
          particular:
          a.   The works shown on the approved Landscape Concept Plan using
               predominately local native species;
          b.   The provision of 6 x 100L local native street trees to the road frontages suitable
               for the location and sight lines.
          c.   Retention of the mango tree within the north eastern corner of the lot within a
               mulched garden setting.
    18.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures
          healthy, sustained and vigorous plant growth. All plant material must be allowed to
          grow to full form and be refurbished when its life expectancy is reached.
    19.   All landscape works must be maintained generally in accordance with the approved
          design for the life of the development.
    ENGINEERING
    External Works
    20.   A 2.0m wide concrete footpath must be provided within the road verge for the entire
          length of the frontage of the site to Wattle Street. The path must generally match with
          the existing grassed verge without causing a trip hazard. The works must be
          undertaken in accordance with an Operational Works approval and must
          include/address the following:
          a.   Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete
               Pathway Construction Details;
          b.   Be extended to smoothly tapered and join with the existing path along Garnet
               Street.
    Reinstatement Works
    21.   Any redundant driveway and/or kerb layback must be removed, and the kerb line and
          verge area reinstated and landscaped to match the existing kerb and/or verge
          treatments. Grassed verge areas to be reinstated must be provided with 100 mm
          topsoil and turf, and must be maintained by the developer until established.



                                                                                   Page 5 of 13
Log in to download the original file

2018-11-12 General Committee Meeting Notes(PDF, 642KB).pdf · 657 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.