GENERAL COMMITTEE MEETING 12 NOVEMBER 2018
22. Any redundant private pathway to the property must be removed, and verge area
reinstated and landscaped to match the verge treatments.
23. Any damaged kerb and channel along the frontage of the site must be repaired to the
reasonable satisfaction of Council’s representative.
Site Access and Driveways
24. A sealed access driveway must be provided from Garnet Street to all parking and
manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-049
and R-050 to grades prevent vehicles from scraping and/or bottoming whilst
also allowing for compliant grades for the footpath and pedestrians movements
along the footpath and the grassed verge without any step or trip hazard.
Car Parking
25. Car parking must be provided within the site generally as shown on the approved
plans. The works must be undertaken in accordance with an Operational Works
approval and must be in compliance with the provisions of AS/NZS 2890.1-2004 with
allowance for standard vehicle to enter and leave the site in a forward gear and with a
minimum head clearance (headroom) at any point of 2.2m.
26. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting to a lawful
point/s of discharge in Garnet Street and/or Wattle Street. The works must be
undertaken in accordance with an Operational Works approval in compliance with the
relevant sections of Queensland Urban Drainage Manual and supported by a detailed
stormwater drainage design prepared and certified by a suitably qualified and
experienced Registered Professional Civil Engineer (RPEQ).
28. The development of the site must not worsen existing drainage conditions on other
properties by diverting stormwater runoff or cause additional stormwater ponding on
any other property.
29. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
30. All earthworks must be carried out in compliance with an Operational Works
Development Permit.
31. All earthworks and associated batters/retaining walls must be contained entirely
within the subject site unless written permission from the respective landowner(s) is
provided to Council.
32. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments, Council’s codes and relevant government regulations and guidelines.
Certification must be provided by an RPEQ and submitted to Council prior to the
issue of the Certificate of Classification for the building.
Page 6 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.