Original source · versioned page text
2022-06-16 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 16 JUNE 2022
6. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation
of excessive noise, lighting nuisance or other emissions.
Car Parking
7. A minimum of 6 car parking spaces and 2 motorcycle spaces must be provided
and marked on the site and made available and accessible at all times while the
use is open for business. The works, including access to the parking, must be
undertaken in accordance with an Operational Works approval and must include
in particular:
a. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition at
all times;
b. Directional signage must be provided to direct customers to the car parking
spaces provided on site.
Service Vehicles
8. Service vehicle parking, manoeuvring, and standing spaces must be provided on
the site and must include in particular a loading bay for a single unit truck 12 metres
x 3.6 metres.
Landscaping
9. The development site must be landscaped in accordance with the approved site
plan and be provided to a minimum of 15% of the site. The works must be
undertaken in accordance with an Operational Works approval and PSP2
Landscaping in Noosa Plan, for that specific area and must include in particular:
a. the works shown on the Approved Plans;
b. A 2 metre wide landscaping strip along the Rene St road frontage of the
subject site, exclusive of the access driveway;
c. All landscape works must be established and maintained in accordance with
the approved design for the life of the development, and in a manner that
ensures healthy, sustained and vigorous plant growth. All plant material must
be allowed to grow to full form and be refurbished when its life expectancy is
reached.
d. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
Stormwater Drainage
10. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and generally in accordance with report titled
“Preliminary Stormwater Management Plan”, rev 0, dated 7 October 2021 and
prepared by RECOR Pty Ltd.
Easements
11. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
12. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
Page 10 of 49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.