Original source · versioned page text
2022-06-16 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 16 JUNE 2022
13. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
14. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
15. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level.
16. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Damage to Services and Assets
17. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
C. Find the following matters relevant to the assessment and sufficient reason to approve
the ‘Motorcycle/Scooter Sales’ component of the application:
a. The proposal is complementary and directly associated with the proposed
industrial use.
b. The proposal will not compromise the use of the area from being used for
predominantly industrial activities.
5 CLIMATE CHANGE RESPONSE GRANTS – 2022/23 ROUND ONE
In accordance with Chapter 5B of the Local Government Act 2009, Cr Stockwell provided the following
declaration to the meeting of a prescribed conflict of interest in this matter:
I, Cr Stockwell, inform the meeting that I have a prescribed conflict of interest in this matter in relation
to the proposed funding allocations to the Noosa Lions Football Club. I am the current President of the
Noosa Lions Football Club and was responsible for the grant applications currently before Council. As
a result of my conflict of interest, I will now leave the meeting room while the matter is considered and
voted on.
That Council note the report by the Carbon Reduction Project Officer to the Planning &
Environment Committee Meeting dated 7 June 2022 and approve the Climate Change
Response Grants as outlined in Attachment 1 to this report.
Page 11 of 49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.