Operational Works Application OPW20/0148- 20 Mermaid Quay, Noosaville

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Noosa Council documents



                                                                                                         OPW1 7/0170



                               Plan No.              Rev.    Plan/Document Name                          Date
                               27117-J1              B       Jetty Plan and Elevations prepared by       2 June 2017
                                                             SCG Consulting Engineers

                               GAP-D01                       Timber Jetty and Drive on Pontoon -         3 May 2017
                                                             General Arrangement Plan prepared by
                                                             Superior Jetties as annotated by
                                                             Council

                      2.      All structures must be designed and constructed such that they are free standing
                              within the waterway and are not connected to or behind the revetment wall
                      3.      All structures must have no detrimental effects on stormwater drains and/or
                              easements.
                      4.      Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the
                              top of the revetment wall.
                      5.      A rigid handrail must be fitted on one side of the walkway.
                      6.      No posts or vertical supports of the proposed jetty are to extend vertically from the
                              structure unless they provide support for the handrail or are required for securing
                              vessels
                      7.       There must be no electrical reticulation system carrying electricity in excess of 24
                              volts beyond the revetment wall unless all switches and power outlets are
                              positioned above the 1%AEP flood level.
                      8.      Lighting associated with the use must be designed, installed, operated, and
                              maintained in accordance with Section 3 of AS4282 Control of the Obtrusive
                              Effects of Outdoor Lighting.
                      9.      Rock scour protection, wrapped in geotextile, extends from 750mm up to
                              approximately 5000mm from the face of the revetment wall in Noosa Waters. Piles
                              are to be:
                              a.       Located clear of this rock protection where applicable, or alternatively
                              b.       Where the scour protection extends beyond 750mm:
                                       i.    Prior to driving piles, the rocks are to be removed to expose the
                                             geotextile and the geotextile cut neatly to allow it to be turned back.
                                             During pile driving, care is to be taken to ensure the geotextile is not
                                             damaged. At the completion of pile driving, the fabric is to be turned
                                             down around the pile and the rocks replaced around the piles
                      10.     The jetty and boat lifting device are to be used for private purposes only with no
                              commercial operations to be undertaken.
                      11.     Boat repair activities are not permitted on site.
                      12.     Wastewater and sullage must only be disposed of at approved pumpout facilities.
                      13.     The mooring facility must not be utilised for live-aboard purposes.
                      14.     Any construction and post construction activity is not to impact on the condition of
                              the waterway, and is to be conducted so as not to breach the Environmental
                              Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.




                                                                                                                  Page 2 of 6

Document Set ID: 20342769
Version: 3, Version Date: 22/06/2017                                                                      Print Date: 26 June 2017, 3:18 PM
Log in to download the original file

Operational Works Application OPW20_0148- 20 Mermaid Quay, Noosaville.pdf · 17.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.