15. Certification by a Registered Professional Engineer of Queensland that states that
the jetty and boat lifting device are constructed in accordance with best practice
methods and are structurally sound must be submitted to Council. This certification
must be submitted to Council within three (3) months of the completion of the
works. A final inspection and approval of the structure by Council’s Inspector is
also required. Please contact Council’s Planning Assessment Section
(Development Audit & Response Officer 0428738563) to arrange the inspection.
16. This approval lapses where the construction of the jetty has not commenced within
two (2) years of the date of issue of the approval, unless application is made and
approved by Council for an extension.
17. After completion, the proposed works must be maintained in a sound state of
repair in accordance with the approved plans
I 5. REFERRAL AGENCIES
Not Applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in
relations to the proposed works. A detailed check of the calculations and drawings
has not been undertaken, as they have been certified by a RPEQ. The RPEQ
bears full responsibility for all aspects of the engineering design. Council reserves
the right to require further amendments and/or additions at a later date should
design errors become apparent.
2. The approval or conditions do not absolve the owner of the land from complying
with all the conditions of this approval and/or relevant Council By-Laws and
Policies and/or relevant statues and/or statutory regulations in the execution and/or
performance of said works.
3. Council reserves the right to call up any performance bond held or levy charges
against the property, should emergency works be required to be undertaken by
Council to make the site safe due to inactivity on the development site for
extended periods of time.
4. Should any changes or modifications to the approved plans be required as a result
of construction constraints, a “Request to change an existing approval” under the
Sustainable Planning Act 2009 must be made. Amended plans clearly indicating
the changes must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
5. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage." It is
an offence to fail to comply with the duty of care. Substantial monetary penalties
may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister
administering the Act can also issue stop orders for an activity that is harming or is
likely to harm Aboriginal cultural heritage or the cultural heritage value of
Aboriginal cultural heritage.
Page 3 of 6
Document Set ID: 20342769
Version: 3, Version Date: 22/06/2017 Print Date: 26 June 2017, 3:18 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.