Budget Review 2 - September Quarter Review 2016/17
Summary   of Submissions Received                                                    $   9,316,947.09  $    470,315.70 -$   1,551,265.23  $   7,765,681.86
    ester)     Cost Centre / Project Description             Cost Centre/ Ledger     2016/17 Current  2016/17 Actuals   Proposed         i aA              CAPEX PROGRAM                  Comments
                                                           Project Number Code       Budget                             Adjustment       Proposed
                                                                                                                                         Revised Budget
CAP027         Noosaville Eenie Creek Road Off-Ramp to     500615          PJ                $123,043 $           543        -$122,500.00          $543.09 Pathways & Enabling Facilities | This project was reviewed and was deferred given other capital
               Underpass Design                                                                                                                                                           renewal priorities
CAP028         Noosa Heads, Park Road Boardwalk           500671           PJ              $1,500,000 $             -        -$473,000.00    $1,027,000.00 Pathways & Enabling Facilities | This project is being consolidated with previous year project numbers
              Construction                                                                                                                                                                for the same project.
CAP029         Munna Crescent Boardwalk Renewal           500719           PJ                      $0 $         32,591        $33,389.00        $33,389.00 Pathways & Enabling Facilities Emergent works request to rectify a damaged retaining wall and
                                                                                                                                                                                          boardwalk at Munna Park.
CAP030        Tewantin Cranks Park Pathway Renewals        NEW             PJ                      $0 $             -          $13,200.00       $13,200.00 Pathways & Enabling Facilities 66m of concrete pathway renewal to remove trip hazards and ensure
                                                                                                                                                                                          public safety.
CAP031         Noosa Heads Pinaroo Park Pathway Renewals   NEW             PJ                      $0 $             -          $16,700.00       $16,700.00 Pathways & Enabling Facilities | 76m of concrete pathway renewal to remove trip hazards and ensure
                                                                                                                                                                                          public safety.
CAP032         Noosaville Wallace Park Pathway Renewals    NEW             PJ                      $0 $             -          $17,500.00       $17,500.00 Pathways & Enabling Facilities 78m of concrete pathway renewal to remove trip hazards and ensure
                                                                                                                                                                                          public safety.
CAP033         Peregian Beach David Low Way Raised         NEW             PJ                      $0 $             -         $80,000.00        $80,000.00 Pathways & Enabling Facilities | To upgrade pedestrian crossing facilities on David Low Way, north of
               Pedestrian Crossing                                                                                                                                                        Herron Street, to facilitate pedestrian movements between the
                                                                                                                                                                                          shopping centre and Rufous Street, Rufous Lane and the proposed
                                                                                                                                                                                          Digital Hub Building
CAP034         Botanic Gardens Pathway Replacement         NEW             PJ                      $0 $             -        $129,075.00       $129,075.00 Pathways & Enabling Facilities | This project is to remove or replace the worst (highest risk) pathways
                                                                                                                                                                                          at the Botanical Gardens with asphalt. This includes total pathway
                                                                                                                                                                                          lengths of 1,020 metres and a width of 2.5 or 3 metres depending on
                                                                                                                                                                                          location.
CAP035         Noosaville, Lake Weyba Drive Bus Turnaround 500702          PJ                $200,000 $             -        -$200,000.00            $0.00 Public Transport Infrastructure Little feedback has been received from Translink in progressing this
                                                                                                                                                                                          project - to be reconsidered in the 2017/18 capital program
CAP038         Cooroy-Belli Ck Road Slip Repair           500605           PJ                      $0 $          1,301          $1,301.00        $1,301.00 Sealed Roads Network           External project manager required to complete grant acquittal in
                                                                                                                                                                                          2016/17 financial year.
CAP039         Cootharaba - Dr Pages Road & Kinmond Creek 500544           PJ                      $0 $         71,609         $91,608.77       $91,608.77 Sealed Roads Network           Completion of culvert stabiliser and replacement. Purchase of land.
               Rd - Construction
CAP040         Noosaville - Mary Street footpath, roadworks & NEW          PJ                      $0 $             -          $74,400.00       $74,400.00 Sealed Roads Network           Renewal of footpath, minor road works and drainage improvements
               drainage improvements                                                                                                                                                      as a result of replacing to a modern day equivalent.
CAP041         Girraween Sportsground Water Bore & Storage 500629          PJ                 $25,000 $        38,222         $55,000.00        $80,000.00 Sports Ground and Facilities   Installation of bore and above ground water tanks to adrdess water
                                                                                                                                                                                          consumption challenges
CAP041         Girraween Sportsground Water Bore & Storage 500629          PJ                      $0 $             -         -$11,000.00     -($11,000.00) Sports Ground and Facilities  Noosa Lions Football club commitment to fund irrigation components
                                                                                                                                                                                          of bore water project
CAP042        Whole of Shire - stormwater structures      500060           PJ                $250,000 $             -        -$180,000.00       $70,000.00 Stormwater Drainage            Budget transfer to Noosaville, Thomas Street & Gympie Terrace
                                                                                                                                                                                          Culvert project
CAP043         Noosaville, Thomas Street & Gympie Terrace  500676          PJ                $350,000 $         8,793        $180,000.00       $530,000.00 Stormwater Drainage            Replacement of a section of stormwater drain from Thomas Street to
              Culverts                                                                                                                                                                    the Noosa River comprised of 1500m x 600mm box culverts which
                                                                                                                                                                                          are starting to fail due to saltwater corrosion.
CAP044        Tewantin Poinciana Ave Kerb & Channel        NEW             PJ                      $0 $             -          $52,000.00       $52,000.00 Stormwater Drainage            Renewal of 130m kerb and channel to ensure the new road surface
              Renewal                                                                                                                                                                     is able to settle without disturbance from future kerb and channel
                                                                                                                                                                                          maintenance works.
CAP045         Cootharaba, Kinmond Creek Road Sandy Creek 500674           PJ                $750,000 $            84        $300,000.00     $1,050,000.00 Stormwater Drainage            To reconstruct the old deteriorating helcoil culverts with new
               Culvert                                                                                                                                                                    concrete box culverts to achieve the current standard (1 in 5
                                                                                                                                                                                          flooding) - the existing road will need to be reconstructed.
CAP046         Cootharaba, Kinmond Creek Road Eastern     500675           PJ                $500,000 $           343        $550,000.00     $1,050,000.00 Stormwater Drainage            To reconstruct the old deteriorating helcoil culverts with new
               Branch Culvert                                                                                                                                                             concrete box culverts to achieve the current standard (1 in 5
                                                                                                                                                                                          flooding) - the existing road will need to be reconstructed.
CAP047         Noosaville Eenie Ck & Reef Street roundabout NEW            PJ                      $0 $             =          $15,500.00       $15,500.00 Stormwater Drainage            The drainage outlet arrangement at Reef Street/Eenie Road
               drainage improvements                                                                                                                                                      roundabout is inadequate to drain stormwater effectively from the
                                                                                                                                                                                          road surface to the centre of the roundabout.
CAP048         Noosa Heads Noosa Junction - Timber Assets  NEW             PJ                      $0 $             -          $90,000.00       $90,000.00 Streetscapes and Road Corridors Urgent maintenance and replacement timber is required to
              Renewal                                                                                                                                                                     rehabilitate these assets to an acceptable standard to be undertaken
                                                                                                                                                                                          in collaboration with Noosa Junction Traders Association.

                                                                                                                                                                                                                              Page 18 of 27
Log in to download the original file

2016-11-17 Ordinary Meeting Agenda(PDF, 5MB).pdf · 5.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.