Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2016-07-12 Planning & Environment Committee Agenda

of 185

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (25.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JULY 2016


          o     service catchments areas for which the network demand projections are stated
                in the planning assumptions.
        Schedule of works table including information derived from the Excel based schedule
          of works model (SOW) and stating the following for each item of future trunk
          infrastructure identified on the plans:
          o     unique map reference to cross reference the item shown on the PFTI map(s);
          o     the description for the item providing a brief overview of the infrastructure’s
                function (or hierarchy), type and size;
          o     the estimated timing expressed in terms of specific years or time periods (e.g.
                2016–2021); and
          o     establishment cost for land or works stated in current cost terms and be
                consistent with the SPA definition of ‘establishment cost’.
        Schedule of works model (SOW) being an excel based spreadsheet model prepared
          in accordance with the SOW User Manual included in Appendix C of the Statutory
          Guideline must be available for viewing or downloading in the original excel format on
          the local government website. This model requires the following inputs to be included:
          o     General financial and other generic inputs;
          o     Unit cost rates of passive assets and land for valuation of each trunk network
                asset item or alternatively, unique values can be entered into the existing and
                future asset sheets;
          o     Demand forecasts for current and future demand per individual cost catchment:
                    Includes residential and non-residential growth from the planning
                      assumptions and their applicable charge rates; and
                    associated individual network catchment demands (eg trips, impervious
                      hectares, population).
          o     Asset Inputs for current and future assets for each network and cost catchment
                detailing individual asset ID, LGIP ID, asset class, asset name, descriptions,
                various asset and land attributes, basic and refined asset values and catchment
                asset allocations.
          The model then undertakes calculations to provide outputs for:
          o     Summary Cost Schedule:
                    Summary of demand and cost allocation by network and catchment; and
                    Final costs per unit demand by network and catchment.
          o     Summary Cash Flow Projections of forecast capital works (Cap X) and
                anticipated Infrastructure Charge (IC) revenues:
    Much of this model’s required inputs and workings relates to details previously necessary
    for a PIP under the pre 2011 SPA amendments in order to derive the former ICS charge
    rates. Whilst these items are now unnecessary and obsolete under the post 2011 SPA
    amendments due to the adopted infrastructure charges regime that now applies, this work
    is still required to be undertaken to satisfy the Statutory Guideline to achieve a LGIP signoff
    from the appointed reviewer and Minister.
    Staff are currently reviewing the current PIP trunk infrastructure network plans and
    following Council’s decisions regarding the previous sections, a report on the staff review
    and proposed PFTI amendments for the new LGIP will be presented for Council review and
    endorsement.


                                                                                 Page 133 of 185
Log in to download the original file

2016-07-12 Planning & Environment Committee Agenda(PDF, 24MB).pdf · 25.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.