Skip to the record
Search everything, all in one place.

Original source · versioned page text

2016-07-12 Planning & Environment Committee Agenda

of 185

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (25.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 JULY 2016


vi.   Extrinsic material.
      All relevant background studies and reports prepared in relation to the preparation of the
      LGIP must be referenced under ‘Editor’s notes – Extrinsic material’ in the LGIP. This
      typically includes planning reports documenting the preparation of the planning
      assumptions, establishment or review of the DSS, network planning and preparation of
      demand generation rates. SPA stipulates that each study, report or explanatory statement
      prepared in relation to the preparation of a LGIP must be available for public inspection and
      purchase.
Information of the Statutory Guideline LGIP review process was provided to the previous Council
in the report to Planning & Organisation Committee Meeting dated 19 August 2014 and is
summarised in the following diagram and further information below:




On completion of the draft LGIP document, the following actions need to occur:
    Council must directly engage at its own cost, an Appointed reviewer (who has been
      appointed to the “Panel of approved LGIP reviewers” set up and maintained by the
      department) to undertake the two compliance checks as part of the review process. An
      estimated cost of $40,000 has been budgeted for this external LGIP consultancy
      requirement.
    Council must complete the relevant component of the LGIP checklist provided in the
      Statutory Guideline and provide it to the Appointed reviewer;
    The Appointed reviewer must review the local government completed LGIP checklist to
      assess the LGIP compliance against the Statutory Guideline and complete the remainder
      of the LGIP checklist. The Appointed reviewer must also provide a signed written statement
      providing a recommendation concerning the LGIP’s compliance with the Statutory
      Guideline.
    The completed draft LGIP, together with all extrinsic material, completed LGIP checklist,
      the Appointed reviewer’s written and signed statement and the SOW model must be
      submitted to the Minister for the first State review.
    On receiving approval from the Minister, the draft LGIP may then proceed to public
      consultation followed by further reviews by Council, Appointed reviewer and the Minister
      before adoption by Council can finally occur.
This review process will take approximately 12 months to complete due to the individual review
and public consultation statutory timeframes involved.
3.    Review of the Priority Infrastructure Area (PIA) proposed for the new LGIP
The current PIP identifies land inside the PIA as individual nodes for the coastal urban area of
Eastern Beaches, Noosa Heads, Noosaville and Tewantin, as well as the hinterland towns and
villages of Cooroy, Pomona, Boreen Point, Cooran, Cooroibah and Kin Kin that was suitable for
urban purposes in the planning scheme. This contained land generally consistent with the urban
type land use zones for detached housing, semi-attached and attached housing, visitor mixed
use, village mix, neighbourhood centre, business centre, shire business centre, community
services and industry.



                                                                                 Page 134 of 185
Log in to download the original file

2016-07-12 Planning & Environment Committee Agenda(PDF, 24MB).pdf · 25.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.