Original source · versioned page text
2016-07-12 Planning & Environment Committee Agenda
The original of this document is very large (25.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2016
Figure 3 – View of the digital hub from David Low Way proposed as part of stage 1.
Figure 4 – Floor layout of the new digital hub building
Stage 2 includes the following:
the construction of a new 465m² Community House and 23 associated car parks - sited in
the south west corner of proposed lot 3 near the common boundary with the tennis courts
(stage 1 temporary car park removed)
the conversion of the existing community house to office spaces for IT enterprise plus a
115m² extension (389m² gross floor area)
a 2nd public amenities block sited near the new Community House
a playground
The final layout is shown in Figure 1. Figures 5 and 6 below show a 3D perspective of the new
Community House, the elevation facing Rufous Street and floor plans.
Page 28 of 185
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.