Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2016-07-12 Planning & Environment Committee Agenda

of 185

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (25.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 JULY 2016


    Fencing
    16.   Fencing shall be erected to all boundaries of the site and shall have a minimum
          height of 1.5 metres Trading Post Road and Pearsons Road and 1.8 metres on all
          other boundaries (Note: fences may be required to have a greater height for the
          purpose of meeting acoustic requirements, as further detailed in these conditions).
    17.   All fencing to road frontages of the site shall be setback a minimum of 1 metre with
          an average of 2 metres and be screened with landscaping, or alternatively, be of
          open construction (ie. minimum 50% transparent) (provided it is not a required
          acoustic fence).
    18.   Any new fencing along the northern boundaries of existing Lot 4 RP 215922 adjoining
          Prospect Park (Lot 101 SP 208264) must be flood compatible e.g. three strand plain
          wire fencing.
    Building Setbacks
    19.   All buildings shall be setback a minimum of 6 metres to Elm Street, Pearsons Road,
          Lamonts Road and Trading Post Road, with the exception of the northern corner of
          the aged care facility shown at 5.5m from Trading Post Lane.
    20.   All buildings shall be setback a minimum distance of 2 metres to adjoining properties.
    Built Form
    21.   Buildings shall be varied in their architectural style, construction materials, colours
          and finishes.
    22.   Transformers, waste storage areas and the like shall be screened to reduce their
          visual intrusiveness.
    External Road/Frontage Works on Main Roads
    23.   Roadworks required on Cooroy Connection Road (Elm Street) at its intersection with
          Pearsons Road including two Bus Stops with shelters, a pedestrian refuge and
          upgrade to existing kerb line and linemarking must be undertaken in Stage 1a of
          development in accordance with a Development Permit for Operational Works. The
          works shall be generally as shown on drawing titled External Works Functional
          Layout Plan Pearsons Road Intersection, prepared by Calibre Consulting dated
          08/01/2016, referenced 15-001261-RF02 Issue B and in compliance with Department
          of Transport and Main Roads (DTMR) standards, and subject to Council’s and
          DTMR’s approvals.
    24.   Roadworks required on Cooroy Connection Road (Elm Street) at its intersection with
          Lamonts Road must be undertaken in Stage 4 in accordance with a Development
          Permit for Operational Works of development. The works shall be generally as
          shown on drawing titled External Works Functional Layout Plan Lamonts Road
          Intersection, prepared by Calibre Consulting dated 08/01/2016, referenced 15-
          001261-RF01 Issue B and in compliance with Department of Transport and Main
          Roads standards, and subject to Council’s and DTMR’s approvals.
    25.   A 2m wide path on Elm Street shall be constructed from the pedestrian access point
          that fronts Elm Street (Gatehouse). The path shall be in accordance with Council’s
          design standards and to an alignment that protects any significant vegetation and
          above and underground services. The works shall be included in Stage 1a and be in
          accordance with a Development Permit for Operational Works. This condition is
          imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk
          infrastructure.




                                                                                 Page 80 of 185
Log in to download the original file

2016-07-12 Planning & Environment Committee Agenda(PDF, 24MB).pdf · 25.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.