Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2016-07-12 Planning & Environment Committee Agenda

of 185

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (25.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         12 JULY 2016


    44.   All parking areas and garages must be in compliance with the requirement of the
          current Australian standards applicable to their use (AS/NZS 2890.1-2004 and/or AS
          2890.2-2002) with a minimum head clearance (headroom) at any point of 2.3m.
    45.   Car parking shall be provided within the site generally in accordance with that shown
          on drawing CO-000-2014 Sheet 01/02 Revision H dated 13 November 2015 and
          titled Overall Site Plan prepared by Palm Lake Works.
    46.   Carparking shall be provided at a minimum rate of 1 space per independent living unit
          for resident parking and 1 space per 4 independent living units for visitor parking; and
          1 space per 2 employees based on the maximum number of employees engaged at
          any one time at the aged care residence and 1 space per 5 beds or occupants of the
          aged care residence.
    47.   A minimum of two clearly defined disabled car spaces shall be provided to service the
          aged care residence and village community centre.
    48.   The pick-up/drop-off parking area associated with the proposed Aged Care
          Development must be designed and constructed to be capable of accommodating at
          least one taxi suitable for use by people with disabilities in accordance with the
          relevant and applicable standards.
    49.   All staff carpark spaces shall be clearly defined by line marking each space with the
          words “Staff Parking Only” and by sign posting each space with a similar wording.
    50.   All carparking shall be kept maintained and line-marked in a condition fit for use.
    51.   An emergency parking bay shall be available at all times in front of the community
          village centre and the aged care residence.
    52.   Visitor car parking shall be conveniently located to all independent living units, village
          community centre and the aged care residence. Directional signage must be
          provided to direct visitors and customers to the car parking spaces provided on site.
    Earthworks
    53.   All earthworks must be carried out in accordance with a Geotechnical Report (or part
          thereof) prepared by a qualified person* and endorsed through a Development Permit
          for Operational Works approval. *(Refer to Advisory Note)
    54.   All earthworks shall be undertaken in accordance with the provisions of AS 3798
          Guidelines on Earthworks for Commercial and Residential Development, with
          geotechnical testing undertaken in accordance with Section 8 of the Standard, and to
          a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS
          3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ
          and submitted to Council prior to final inspection/s of works.
    55.   A registered practicing Geotechnical Engineer shall test the existing ground
          conditions for suitability of placing additional fill, prior to such fill being placed.
    56.   Filling works shall be restricted to the subject site itself, and the finished fill levels are
          to taper to the existing levels on the property. Batters shall be at a maximum grade
          of 1:4 unless retained by an engineer-designed wall or approved retention method.
    57.   Any fill imported to the site may only be from a site licensed with The Environmental
          Protection Agency or from a site for which a Development Permit for Operational
          Works has been issued approving the export of fill.
    58.   Following completion of the filling works for each Stage, the registered practicing
          Geotechnical Engineer supervising the works shall submit compaction tests across
          the entire filled areas and make recommendations if special foundations
          requirements will apply.



                                                                                      Page 83 of 185
Log in to download the original file

2016-07-12 Planning & Environment Committee Agenda(PDF, 24MB).pdf · 25.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.