PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2016
65.2. a contingency plan to monitor for and to remove cyanobacterial and algal
outbreaks from waterbodies, including costs, is provided for approval with the
Operational Works application and the approved version is implemented
throughout the lifetime of the development. All stormwater runoff treatment
must be undertaken within the development areas of the site. Stormwater likely
to contain grease and oil (i.e. from all roads and car parking areas) shall be
managed via grease and oil arrestors prior to treatment within bioretention
basins, wetlands and water quality control ponds.
66. Wetlands, bioretention basins and other water quality treatment devices shall be
designed and constructed in accordance with Healthy Waterways Water Sensitive
Urban Design – Technical Guidelines for South East Queensland 2006, Water by
Design Bioretention Technical Design Guidelines 2014, Healthy Waterways Water by
Design Construction and Establishment Guidelines: Swales, Bioretention Systems
and Wetlands February 2009. In the case of any inconsistencies between these
documents, the most recent document shall prevail.
67. Stormwater treatment strategy must be designed and maintained to achieve
compliance with the approved version of B14158.W.07L.AMcP.ag.docx dated 8
October for the Stormwater Management Construction and Maintenance Plan
Framework.
68. The detailed Stormwater Management Construction and Maintenance Plan (SMCMP)
must be designed and implemented in accordance with the framework detailed in the
approved version of B14158.W.07L.AMcP.ag.docx dated 8 October and approved by
the Council prior to issue of operational works approval:
69. The owner of the development is responsible for all costs associated with the
construction and ongoing maintenance and repair of the treatment of stormwater on
the site and for all catchments that enter the site.
70. The Operational Works Application must include calculations in accordance with the
Queensland Urban Drainage Manual to demonstrate that the confluence of
stormwater at the drainage easement will not cause scour and that any required
dissipater/erosion control can be contained wholly within the applicant’s property.
71. Any waters captured on site must be plumbed to be available for all external uses
including gardening, irrigation, filling swimming pools and outdoor cleaning, as well as
all ground floor toilet cisterns and washing machine cold taps.
72. Operational Works Application must demonstrate that the peak 1-year ARI event
discharge off site is limited to the pre-development peak 1-year ARI event discharge
flow.
73. Prior to commencement of use, the applicant must provide Council with a
performance bond to the value of 150% of the value of monitoring and maintenance
of the water bodies for the first 5 years of full operation. The bonds shall
be incrementally released annually following completion of the development
and upon demonstration to the satisfaction of Council Officers that all aspects of the
approved version of the detailed Stormwater Management Construction and
Maintenance Plan required by this approval have been implemented to effectively
prevent or reduce likelihood of cyanobacteria outbreaks for the site for the preceding
year.
Water & Sewer Connections
74. An underground connection to reticulated water and sewerage must be provided to
the development site in accordance with the standards and requirements of Northern
SEQ Distributor–Retailer Authority (Unitywater).
Page 85 of 185
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.