PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2016
75. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Power Supply
76. An underground electricity service shall be provided to the site if not already
provided. In this regard, an approved ENERGEX Electrical Design Consultant shall
work in conjunction with Council’s Manager - Works Support to prepare detailed
designs of the electrical proposal.
The detailed designs shall then be submitted to ENERGEX for approval and a copy of
their approval submitted to Council in conjunction with a “Certificate of Electricity
Supply for Proposed Subdivisions” (prepared by an approved ENERGEX Electrical
Design Consultant) prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design
Consultant shall be wholly at the applicant’s expense and shall not entail a financial
encumbrance on future purchasers of the proposed lots.
77. The requirements of ENERGEX shall be satisfied in relation to any existing services
traversing the site. Written confirmation by ENERGEX that satisfactory arrangements
have been made to formalise any required easements and/or existing informal
services shall be submitted prior to Council endorsing the Plan of Survey.
78. Streets lighting and pathways lighting throughout the development site must be
provided in accordance with Australian Standards.
79. Street lighting shall be provided along Pearsons Road frontage of the site in
accordance with Australian standards.
Telecommunication
80. The requirements for TELECOMMUNICATION services shall be satisfied in relation
to the provision of new telephone services to the developed site. In this regard
written confirmation from an approved telecommunication agency shall be submitted
to the Council prior to Council endorsing the Plan of Survey.
Erosion and Sediment Control
81. Any person acting on this permit shall prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel access
to the site and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
General
82. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works. In this regard a DXF/DWG file on
GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
83. Digital detailed designs including drawings, calculations, specifications and a
schedule of works, shall be submitted with any application for a Development Permit
for Operational Works in respect of roadworks and stormwater drainage works. The
design shall be in accordance with Council’s Planning Scheme Policy PSP05 –
Engineering Design Standards – Roads, Drainage and Earthworks. To avoid conflict
with underground pipes or services, all existing and proposed services required by
the development shall be shown on the plans.
Page 86 of 185
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.