Council archive · source document
08/0176 - Response to Information Request [As Published] · 132008.176
Very large file (28.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
@ Page3 ttem 14: Whitten details of water conservation and reuse measures. Applicants Response: DB8/ Request for information details water conservation and reuse measures. item 15: Confirmation of the proposal consistency with the various management plans approved for the site. Applicants Response: The proposal will comply with the approved management plans for the site. item 16: Indicate widths of access ramps. Applicants Response: DB8/ Request for information details the widths of access ramps. item 17: Amended plans to indicate tuming areas in carparking aisles. Applicants Response: Refer DB/ Request for information. item 18: Indicate turing paths for vehicles at intersections. Applicants Response: Refer DB/ Request for Information. Item 19: Indicate site lines. Applicants Response: Refer DB/ Request for information and Dianne Hayes traffic report. item 20: Provide carparking dimensions. Applicants Response: Refer DB/ Request for information and Dianne Hayes traffic report. Item 21: Indicate the grades of access ramps. Applicants Response: Refer D&/ Request for Information. Item 22: Indicate type and location of any barriers. Applicants Response: Refer DB/ Request for Information. item 23: Indicate the location and extent of the existing landscaped median. Applicants Response: Refer OB! Request for information site plans and Dianne Hayes traffic report. The egress from the site has been positioned so that it can utilise the break between the medians. item 24: Demonstrate that service and delivery vehicles can access the loading areas. Applicants Response: Refer DB/ Request for information and Dianne Hayes traffic report item 25: Additional details to be provided on the proposed vertical clearances between the proposed ramps and the various services. Applicants Response: Refer DB/ Request for Information. item 26: Submission of a preliminary stormwater design in accordance with relevant approved Management Plans. Applicants Response: Refer D8/ Request for information. A more detailed plan will be provided at the operational works application stage.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0176 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 28.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.