Specific Outcomes Probable solutions (if code assessable) Applicant Comment
other native habitat areas, their associated buffers and a minimum of 30m from the top of the bank of a watercourse and
linkages/corridors and natural and cultural features; and 10 from the top of the bank of a drainage line; AND
g) be cost effective to maintain. AND
S25.5 Land intended for public open space complements
existing adjacent and surrounding open space areas and
provides linkages to these areas; AND
S25.6 Open space is provided adjacent to watercourses, with
roads servicing the linear parkland and lots located on the
O26 The natural environmental and cultural values of land in the opposite side of the road to the watercourse.
Open Space Conservation Zone is not adversely affected by
subdivision, and land in freehold tenure in this zone is not S26.1 Land in the Open Space Conservation zone is retained in C26 Not applicable. The site is no situated in the Open Space
subdivided. one contiguous lot. Conservation Zone.
O27 Adequate land is provided for active recreation and is of a S27.1 Active parkland is of a compact shape free of irregular C27 Not applicable. No active parkland is proposed.
physical standard and condition suitable for the intended uses boundaries and is no less than 1ha in size; AND
and is not subject to physical or other constraints including
contamination, biophysical constraints or legislative protection S27.2 At least 60% of the active parkland provided within the
that would encumber it use. development is unencumbered by legislation or covenants that
would restrict its use for active recreation; AND
S27.3 Active parkland is located on land that is exclusive of—
a) flood inundation below the 20% AEP (1:5 year ARI level);
b) land affected by stormwater or overland flow discharge
from adjacent allotments;
c) drainage reserves and detention
d) basins, which cannot be shown to safely and effectively
contribute to the network of parks and open space areas;
e) land with a slope, or subject to cut and fill with a batter
slope, that exceeds a slope of 15% (1:67);
f) areas of land less than 15m wide, such as access and
service and utility easements;
g) land required to serve primarily as a buffer area to any
existing development or major transport corridor; and
h) power easements. AND
S27.4 At least 10% of the total open space provision for active
parkland is exclusive of flood inundation below the 1% AEP (1:100
year ARI level or the highest recorded flood level, whichever is the
greatest.
Availability and protection of resources S28.1 No additional lots are created within Areas of Potential C28 Not applicable. The site is not identified as being located
O28 Development does not limit the potential for the utilisation Extractive or Mining Resource Influence shown on Overlay Maps within an Area of Potential Extractive or Mining Resource
of extractive resources by creating conflicts of interest. OM1.5—OM9.5. Influence.
14.201 Road and rail corridors
Please consider the environment before re-printing this Development Application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.