M2358
Page 34 of 43
March, 2010
5.5 Natural Hazards Overlay Code
Column 1 Column 2 Column 3
Specific Outcomes Probable solutions (if code assessable) Applicant Comment
13.32 Effects of Use
General S1.1 The proposed development is not located in a landslide C01 Not Applicable. The site is not identified as being within a
O1 Development is located to ensure it does not compromise hazard area as landslide hazard area. As such, the proposal does not increase
the safety of people, property or hazardous materials indicated on Overlay Maps OM1.3-OM9.335; the risk of landslide.
manufactured or stored in bulk OR
by increasing risk of landslide; S1.2 The development site is not subject to landslide, either
internally or from sloping land above the site {eg. slopes are less
AND than 1 in 10 (10%)
AND
S1.3 Development, including necessary earthworks within Precinct
F of the Noosa Springs site, improves the stability of any non-
natural landform so it is not at risk from landslide either on the site
or from sloping land above the site.
O2 Development, including accessways is designed and S2.1 No solution provided C02 Not Applicable. The site is not identified as being within a
constructed to— landslide hazard area. As such, the proposal does not increase
a) minimise impacts on the natural landform; the risk of landslide.
b) minimise risk to people and property from landslide;
c) avoid any potential instability and associated problems,
including long term stability of the site and long term stability of
the development.
Protection of Infrastructure and Community S3.1 Community Uses and Infrastructure Uses are not located C03 Not Applicable. The site is not identified as being within a
Uses in a landslide hazard area as indicated on Overlay Maps OM1.3- landslide hazard area.
O3 Community Uses and Infrastructure Uses, including that OM9.3;
identified below, are able to function effectively during and OR
immediately after landslide
events— S3.2 The community infrastructure development—
a) Emergency service facilities; a) does not result in any new building work other than an addition
b) Hospitals; to an
c) Education Type 4 uses, including stores for valuable records existing building;
or items of historic or cultural significance; and b) does not involve vegetation clearing;
d) Service and utility uses, including electricity substations, and
major electrical depots and water treatment plants. c) does not alter ground levels or stormwater conditions;
OR
S3.3 The development includes measures that ensure—
a) the long term stability of the site;
b) access to the site will not be impeded
by a landslide event; and
c) the community infrastructure will not be adversely affected by
landslides
originating on sloping land above the site.
Please consider the environment before re-printing this Development Application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.