Council archive · source document
10/0627 M2358 Planning Report.pdf [As Published] · 152010.627
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
M2358
Page 35 of 43
March, 2010
Column 1 Column 2 Column 3
Specific Outcomes Probable solutions (if code assessable) Applicant Comment
New Uses S4.1 The use is sited on land that is not in a Medium or High C04 The proposed reconfiguration provides sufficient area to
O4 The proposed use does not compromise the safety of people Bushfire Hazard Area; accommodate the 6m wide bushfire buffer and access track, as
or property from bushfire. OR required by the conditions of Development Approval (Council
Reference: DA2007/1259).
S4.2 The use is sited on land that is determined as low bushfire
risk by a site specific bushfire hazard assessment.
Protection of Infrastructure and Community Uses S5.1 Community Uses and Infrastructure Uses are not located C05 Not Applicable. The application does not propose to
in a High or Medium Bushfire Hazard Area identified on Overlay develop any uses identified in the Specific Outcomes.
O5 Community Uses and Infrastructure Uses, including that Maps OM1.4 to OM9.4;
identified below, are able to function effectively during and OR
immediately S5.2 Building work will not involve more than an additional 20m2
after bushfire events— of gross floor area to an existing building;
a) Emergency service facilities; OR
b) Hospitals; S5.3 Where located in a High or Medium Bushfire Hazard Area
c) Education Type 4 uses, including stores for valuable records identified on Overlay Maps OM1.4 to OM9.4, uses are designed to
or items of historic or cultural significance; and function effectively during and immediately after bushfire events.
d) Service and utility uses, including electricity substations,
major electrical depots and water treatment plants.
Hazardous materials S6.1 Hazardous materials are not manufactured and stored on the C06 Not Applicable. The proposal does not result in the storage
O6 Public safety and the environment are not adversely affected site. or manufacturing of hazardous materials.
by the detrimental impacts of bushfire on hazardous materials
manufactured or stored in bulk.
13.34 Siting, Design and Construction
O7 Uses and works including building works are sited, designed S7.1 Uses and works including building works are sited— C07 The proposed reconfiguration provides sufficient area to
and constructed to— a) on lots greater than 2500m2; accommodate the 6m wide bushfire buffer and access track, as
a) minimise the number of people and property subject to i) in locations of lowest hazard within the lot (Figure 13.5 provides required by the conditions of Development Approval (Council
bushfire risk; and guidance); and Reference: DA2007/1259).
b) maximise the protection of people and property during the ii) to achieve setbacks from hazardous vegetation of 1.5 times the
passage of a fire predominant mature canopy tree height or 10m whichever is the
front. greater; and
iii) 10m from any retained vegetation strips or small areas of
vegetation;
and
iv) so that the elements of the development least susceptible to
fire are sited closest to the bushfire hazard;
b) on lots 2500m2 or less - to maximize setbacks from hazardous
vegetation.
13.35 Water Supply for Fire Fighting
Please consider the environment before re-printing this Development Application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.