Specific Outcomes Probable solutions (if code assessable) Applicant Comment
(1 being the safest – 6 being the most hazardous)
Table 13.10 Flood Hazard Areas
13.38 Effects of Use and Subdivision
Safety and floodplain function S14.1 The use does not result in an increase in the number of C14 The site will be filled in accordance with the MCU approval
O14 The proposed use does not compromise the safety of persons living, working or congregating in Flood Hazard Areas (Council Reference: DA2007/1259). This ensures future
people or property from floods up to and including a 1% AEP identified on Overlay Maps OM1.3—OM9.3; or development will remain flood free.
(1:100 year ARI) flood event.
S14.2 At least one access route above the 1% AEP (1:100 year
ARI) flood level is available for evacuation; or
S14.3 An area of sufficient size and dimensions to accommodate
users is provided, above the 1% AEP (1:100 year ARI) flood level
that allows for safe congregation and evacuation;
AND
S14.4 Works avoid any reductions in on-site flood storage
capacity and contain within the site any adverse changes,
including changes to the depth, duration or velocity of flood waters
up to and including a 1% AEP (1:100 year ARI) flood event.
O15 Development does not result in adverse impacts on S15.1 No solution provided C15 The site will be filled in accordance with Development
people‘s safety and capacity to use land within floodplains. Approval (Council Reference: DA2007/1259), to ensure the
site is free from potential flooding issues.
Hazardous materials S16.1 Hazardous materials are manufactured and stored above C16 Not applicable. No hazardous materials are to be stored on
O16 Public safety and the environment are not adversely the level of a 1% AEP (1:100 year ARI flood event; the site.
affected by the detrimental impacts of floodwater on hazardous OR
materials manufactured or stored in bulk.
S16.2 Buildings or structures used for the manufacture or storage
of hazardous materials are designed to prevent the intrusion of
floodwaters up to the level of a 1% AEP (1:100 year ARI) flood
event.
Infrastructure
Please consider the environment before re-printing this Development Application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.