Skip to the record
The only place to find full transcripts.

Council archive · source document

10/0627 M2358 Planning Report.pdf [As Published] · 152010.627

of 102

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

71.1

71.2

71.3

The EMP shall demonstrate a high level of environmental care and responsibility
and be consistent with best practice for developments of this type in similar
environments.

The EMP shall detail the Developer's environmental policy and the proposed
environmental management system for the Site.

The EMP shall specify:

_ 71,3.1the performance targets, including those derived from the Conditions and

71.4

71.5

other requirements arising from legislation and other approvats;
71.3.2 how the performance targets are to be achieved;
71.3.3 who is responsible;
71.3.4 when the performance targets will be satisfied;
71.3.5 how performance will be monitored;
71.3.6 corrective actions and contingency measures;
71.3.7 reporting arrangements;
71.3.8 auditing arrangements;

71.3.9 how the requirements are to be incorporated into construction and works
contracts;

71.3.10 how the Developer's employees, contractors and the contractor's
employees will be informed and trained with respect to the environmental
protection requirements;

71,3.11 enforcement; and
71.3.12 penalties for non-compliance.
In particular, but without limitation, the EMP shall address the following issues in

relation to the construction phase :

70.4.1 legislative compliance;

70.4.2 soil erosion and sediment control;
70.4.3 vegetation protection;

71.4.4 fauna and fauna habitat protection;
71.4.5 weed and pest control;

71.4.6 water quality protection;

71.4.7 ground water protection;

71.4.8 air quality protection;

71.4.8 storage and handling of hazardous substances;
71.4.9 noise and vibration management;
71.4.10 waste management;

71.4.11 cultural heritage management;
71.4.12 visual amenity protection;

In particular, but without limitation, the EMP shall address the following issues in
relation to the operational phase:

71.5.1 legislative compliance;

71.5.2 water conservation;

71.5.3 water quality protection;

71.5.4 maintenance of Stormwater Quality Improvement Devices

Used in these records

About this file

File size
15.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0627 M2358 Planning Report.pdf [As Published].pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.