72, 71.8.5 vegetation protection; 71.5.6 fauna protection; 71.5.7 bushfire control; 71.5.8 weed and pest control. 71.9 waste management. The EMP shall be submitted to Council in prior to or in conjunction with the lodgement of any development applications for Operational Works for the Site. Operational Works approval shall not be granted until the EMP is approved by the Coordinator of Environment and Landscape. The Developer shall comply with the requirements of the EMP. Sewer Mains 73. 14, 75. 76. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in accordance with Council's standards and requirements at no cost to Council. Existing sewer traversing the site to be abandoned and removed in accordance with Council’s Planning Scheme Policy, PSP6 - Water & Sewerage Design Standards. New sewer to service existing connection to Lot 51 SP156203, No.221 David Low Way to be constructed along and within the northern and eastern boundary of the development site to a point adjacent to Council sewer manhole MP20/02/09. Connection to be made to existing manhole by contractor approved by Sunshine Coast Regional Council. New sewer to be contained in an easement in favour of Council in accordance with the requirement contained in Council’s Planning Scheme Policy, PSP6 - Water & Sewerage Design Standards. No building or other structure requiring a building permit will be allowed within the zone of influence of the sewer. Town Water Supply 77. 78. 79. 80. The site shall be connected to Council's existing town water supply and be constructed in accordance with Council's standards and requirements at no cost to Council, A single Council installed primary water meter must be provided immediately inside the Property boundary. Additional water meters must be installed for each title of a community title or sub-lease scheme. Meters must be Council approved, installed in accordance with Council requirements and remain accessible at all times for reading and maintenance purposes. A separate metered domestic main and bypass fire main must be provided within the development in accordance with Sunshine Coast Water Standards The applicant is advised that this development may require the provision of fire hydrants and a booster pump in accordance with the Building Code of Australia, and consultation may also be needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is provided. To this end, any necessary fire hydrants shall be clearly shown on the plans submitted for both Operational Works and Building Works approval and if a booster pump is deemed necessary, the plans shall indicate where the fire truck is to be accommodated in order to provide boosting to the water supply. Service Easements (Sewer) 81, A registered easement shall be created over the zone of influence of all sewers within the subject site and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary width of the easement, _ which shall be shown on any plans submitted for Operational Works approval. To this
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.