Council archive · source document
10/0627 M2358 Planning Report.pdf [As Published] · 152010.627
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
IDAS.C-6 ® considered unwarranted by a UXO contractor due to the extent of any prior excavation or * earthworks or, conversely, of any filling proposed 4s part of the development program; or * prevented or made impracticable by the presence ofa structure, stockpile, natural barrier or metal waste. . In. the latter case, alternative action may be appropriate to minimise the risk in the first instance, For example, where the tisk of exposure to any UXO that may exist is reduced by the presence of a siracture or natural banter, issuance of the standard UXO waming (see Condition 4.2) may suffice while the structure, stockpile or barrler remains in place, Where a structure is to be removed or reduced as part of the development prograin, protective precautions, commensurate with any greater tisk to witich workers might then be exposed, may need to be considered. Progressive assessment will be necessary where such circumstances exist. Unless, at the completion of preliminary works, there is evidence then available to the UXO contractor that any residual risk is negligible, the use of detection equipment will typically be required to confixm the site’s status, . Where investigation, along with any subsequent remedial action and assessment, is to be implemented by stages to satisfy Condition 4.1 and 4,3, a preliminary investigation report should be submitted by the applicant to the EPA along with a management plan for the proposed work. Staged investigation/remediation is most likely to be applicable where development of smaller, built-on lots (which can present ciroumstances such as those discussed above) or broadheotare sites is proposed. In such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the * development will be dependent on agreement with the management plan. . Where Condition 4.1 is to be satisfied by a whole Jot or broadhectare development stage being subjected to investigation and any necessary remedial action, the BRA, based on the subsequent investigation/remediation report's findings and re¢ommendation/s, may reassess the lot, or that portion comprising the development stage, as being remediated or'not needing remediation, and advise the applicant and Council accordingly. Otherwise, any balance of land that has not been further investigated will retain the risk assessmient made by Defence. This is unless evidence obtained from the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the balance, In the latter case, tho BPA tay reassess all of the balance or the applicable part/s as being unaffected by UXO. so : . 6 Additionat information . ‘This concurrence response applies only to contaminated land issues and does not remove the need to obtain any further approval for this development which may be required by this or other Legislation, State and/or Commonwealth. Applicants are advised to check with all relevant statutory authorities. Applicants should also comply with all relevant legislation. The EPA has not provided a notification to native title pazties for this application, The State*s Native Title Work Procedures indicate that the responsibility for assessment of native title issues for att IDAS application rests with the Assessment Manager. It is recommended that the Assessment Manager determines whether native title notification is required for this application. *End of response* TAS C-6 CLM VER 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.