Council archive · source document
10/0627 M2358 Planning Report.pdf [As Published] · 152010.627
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Apo IDAS C-6 Defence advises that development or land use rezoning proposals for Jand within a ‘substantial’ zone should only proceed following the conduct of UXO investigation and clearance activities. Defence maintains a list of commercial UXO investigation and remedial search contractors that it accredits to carry out this work, Defence also recommends that owners or occupiers of potentially affected land and workers and contractors employed on the land need to be aware of the procedure if a suspect object is found. As the EPA has no record of the site being further investigated or remediated, it'is considered that there remains a possibility of UXO being found on it. . : 4 Conditions The following concurrence agency conditions aro fo be attached to any approval: 4.1 Prior to the commencement of any excavation, eatthworks or soil disturbance related to this development, that part of the site to be so worked is to be subjected to investigation and, where necessary, appropriate remedial action, 42 Any pérson employed to work on any part of the: site where Condition 4.1 has not been satisfied is to be forewarned in writing by the applicant. . ‘This warning is to explain that information availible to the BPA indicates a potential for residual UXO exists on the site and work should proceed with due caution. Itis to state the procedure to be followed by any person finding an object suspected of being explosive ordnarice or component thereof: . Do not disturb the object, . Take action, where appropriate, to preventit being disturbed by another petson. Note its approximate dimensions and general appearance, Note the route to its location. Advise the Police as soon as possible, esceeos 4.3” Following investigation and eny remedial action taken to satisfy Condition 4,1 above, the applicant is to sbbmit azeport, prepared in accordance with current guidelines, to the EPA for assessment, The EPA is to subsequently advise the Noosa Council and the applicant of its assessment in regard to Condition 4.1 being satisfied, 44 No gravel, rock, sand or soil is to be removed from the site without written EPA approval. 45 Theapplicantis to advise the owner and any occupier of the site of the above responsibilities. - 5 Additional comments or advice - Applicants may contact the BPA*s Contaminated Land Unit on (07) 3224 5644 or visit the Defence website hutpriwww defence. govauuxo/ for the details of current UXO investigation and remedial search conftactors. The EPA accepts reports based on investigative and remedial work carried out by these contractors. . , Investigation dnd remedial action to satisfy Condition4.1 typically involves sampling/search. programs with detection equipment unless the use of such equipment is: . VER 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.