3. TRAFFIC MANAGEMENT
Item 8.a.i. in Council’s information request states:
8. “A preliminary Construction Management Plan … must include but not be limited to;
a. traffic management during all aspects of the development including;
i. a Traffic Management Control Plan (for demolition, deliveries and
construction) in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD) detailing all temporary signage and traffic control measures
ii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased.”
iii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased.”
iv. provision for worker car parking at off-site locations.”
Preliminary Traffic Guidance Schemes for the proposed commercial development has been
prepared by the Traffic Design Company and are attached at Appendix B.
These documents illustrate Construction vehicles utilising several parking bays on Kingfisher
Drive adjacent to the development. Access for construction vehicles is to be coordinated with
early warning traffic signage and Traffic Controllers. The documents show the proposed
redirection of pedestrians to the opposite side on Kingfisher Drive via a pedestrian crossing,
traffic signage and Traffic Controllers. Proposed fencing and traffic bollard location have also
been illustrated on these documents.
Proposed site compound and worker vehicle parking will be confirmed upon appointment of
the Principal Contractor for the works.
4. EROSION & SEDIMENT CONTROL PLAN
Item 8.b. in Council’s information request states:
8. “A preliminary Construction Management Plan … must include but not be limited to;
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures.”
Noosa Shire Council’s ‘The Noosa Plan Schedule 2 – Erosion and Sediment Control (ESC)
Assessment’ provides a scoring system to assess erosion hazard during demolition and
construction phase. The Developer and Contractor are committed to the management of
erosion and sediment from the site throughout the duration of the project. An Erosion &
Sediment Control Plan for the proposed works has been attached in Appendix C.
www.jce.engineering 7 J.C. Engineers Pty. Ltd.
Level 13, 50 Cavill Avenue,
SURFERS PARADISE
QLD 4217
See the original