RFI - SWMP Elands
The original of this document is very large (17.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
4. Conclusions & Recommendations
4.1 Proposed Stormwater Management Plan
Through the hydrological analyses, it is identified that the proposed development will cause
flow increase, which might result in actionable nuisances to the existing environment.
Therefore, two 7kL roof water detention tank are proposed to mitigate the flow from the roof
area. Eventually, Stormwater runoff from the site will be discharged to the east downstream
area as sheet flow, as shown in Appendix E.
Building applications for future impervious area on the allotment shall address their impacts
on stormwater quality on an individual basis. The entire stormwater drainage system up to
lawful point of discharge must be maintained by body corporate arrangement in perpetuity.
No drainage system as part of this approval will be Council asset.
4.2 Recommendations
4.2.1 Construction Phase
Prior to commencement of construction, an Erosion and Sediment Control Plan (ESCP) will
be implemented to minimise the impacts on stormwater quality. The plan will address site
and catchment specific erosion control measures, generally adhering to the following control
measures.
4.2.2 Pre-Construction
Before construction the following measures will be established and maintained for any to be
disturbed:
• Sediment fences to be erected;
• Stockpile areas to be designated to minimise impacts on site runoff; and
• Provision of shakedown pit for any entry/exit points to the site.
4.2.3 During Construction
• Construction related activities will be contained within the subject site where
possible to minimise areas of disturbance.
• Topsoil retention for site rehabilitation.
• Regular inspection of sediment control measures; and
File Name: WCD-22936 – 65-67 Elanda_SWMP.docx
Revision: B 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.