Original PDF page 21, section 1. The text section number identifies this passage in the reader.
65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
• Contractor’s Construction Management Plan to include day to day management
requirements.
4.2.4 Post Construction
Following construction any disturbed areas will be stabilised through revegetation which is
to be maintained until established.
4.2.5 Operational Phase
Building applications for future dwellings on the allotments shall address their impacts on
stormwater quality on an individual basis.
File Name: WCD-22936 – 65-67 Elanda_SWMP.docx
Revision: B 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.