19660 OPW26-0033 - response to info request
Response
Kerb ramp has been relocated as requested. Refer revised plans.
Item 3 – Upgrade of Red/Pottery Street Intersection
Council’s Infrastructure Services department have requested that the alignment of the
proposed kerb and channel at the northern tangent point on Red Street align with the existing
kerb and channel fronting 4 Red Street (5RP814922). Additionally, it is unclear how
concentrated flows from the proposed kerb and channel will be released back into the existing
table drain in Red Street.
Information Required
3. Provide amended plans that provides a revised kerb and channel alignment at the
Red/Pottery Street intersection that is a projection of the existing kerb and channel
fronting 4 Red Street (5RP814922). The revised alignment must provide scour
protection from the kerb to the existing table drain.
Response
As per our discussions and emails with Daniel Epps, there is no kerb and channel on the
eastern side of Pottery St/Red St intersection and this has been accepted by Council. The
alignment of the edge of bitumen has been adjusted to align with the existing kerb and channel
in front of 4 Red St.
Item 4 – Gravel Driveway Crossovers
The proposed gravel driveway crossovers to 1 Red Street (1RP71117) and 38 Pottery Street
(1RP148139) do not comply with Council’s standard drawing RS-051 because they are not
sealed.
Advisory Note – Council considers this application is the incorrect application to seek
retrospective approval for any existing unapproved secondary driveway crossovers.
Information Required
4. Provide amended plans that includes sealed driveway crossovers to 1 Red Street
(1RP71117) and 38 Pottery Street (1RP148139) pursuant to Council’s standard drawing
RS-051.
Response
As per our discussions and emails with Daniel Epps, adjustments of the existing driveways to 1
Red St and 38 Pottery St are shown on our drawings but will be crossed out by Council and
noted that they do not form part of this application and that the construction of these accesses
is not within scope of this development.
Page 2 of 9
Tod Job Number: 19660-OPW2-A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (19660 OPW26-0033 - response to info request.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.