19660 OPW26-0033 - response to info request
Issue 5 – Access to Proposed Lots 1 – 5 Although not a condition of the Higher Order Approval (RAL19/0014), Council’s preference is that these future lots are provided with a driveway crossover as part of these works. This will avoid the need for a separate Operational Works application to remove a street tree for each future lot’s driveway crossover. Information Required 5. Provide amended plans that details a driveway crossover to proposed Lots 1 – 5. Response As per our discussions and emails with Daniel Epps we believe that it is preferable to leave the location of future driveways to these lots to the future owners so that they can be aligned to suit their house design. Council has accepted this preference – no amendment to drawings. Issue 6 – Bioretention Basin The proposed bioretention basin includes rock armouring of the inlet in lieu of a sediment forebay. A maintenance access driveway to the maintenance ramp has not been provided. Information Required 6. Provide amended plans that includes a bioretention basin with a sediment forebay and the provision for a maintenance driveway. 6.1. The forebay must be accessible for maintenance purposes and be designed in accordance with Water by Design’s guidelines. 6.2. The maintenance driveway must be concreted and include a lockable bollard to prevent non-authorised vehicles from entering the maintenance driveway. Response A maintenance vehicle access with lockable bollard has been added to the drawings, however as the catchment area reporting to the bio basin is less than 2ha a sediment forebay is not required. Refer extract from Water by Design - Bioretention Technical Design Guidelines 2014 below. The area reporting to the bio basin is 1.256Ha, as noted in table 2.4 (section 2.3.2) of the Stormwater management plan prepared by Aquaintel and approved under the higher order approval. As such we have retained the rock scour protection at the outlet as shown on the original plans. Refer revised drawings for details of the access. Page 3 of 9 Tod Job Number: 19660-OPW2-A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (19660 OPW26-0033 - response to info request.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.