Original source · versioned page text
19660 OPW26-0033 - response to info request
Issue 10 – External Works Condition 6 of the Higher Order Approval (RAL19/0014) seeks that the development provide kerb and channel and a footpath for the full length of the site’s frontage to Pottery Street. The engineering plans does not include a footpath and kerb and channel for the full length of the site’s frontage to Pottery Street. Information Required 10. Provide amended plans that includes a 1.5m wide footpath and kerb and channel for the full length of the site’s frontage to Pottery Street. The southern leg of future kerb and channel must be generally consistent with the existing road alignment. Note: Council recognise that an opportunity may exist to remove “5/A” and redesign “6/A” as a kerb inlet pit to capture flows for the requested kerb and channel. Response Kerb and channel and footpath have been extended for the full length of the development frontage on Pottery Street. Refer revised drawings. Issue 11 – fencing to protected land The application cover letter states: “We believe that condition 25f(ii) of RAL19/0014 contradicts the requirements in condition 31 and have adopted the requirements of condition 25f(ii) by not showing a fence along the eastern side of the covenant area…” Council does not accept this position. Construction of a fence along the eastern boundary of the covenant area is considered essential to ensure the long-term protection and effective management of the covenant. This fencing provides a clear physical barrier to safeguard the environmental values within the covenant area and assists the owners of Lot 8 in managing their land appropriately. Conditions 25f(ii) and 31 are not inconsistent and can be satisfied concurrently. Access to the covenant area can be facilitated through the installation of a gate from the existing easement within Lot 8, enabling entry for emergency and management purposes while maintaining the required fencing to protect the area. Information Required 11. Provide a revised plan (Roadworks and drainage plan, drawing no. 19660-C201, dated 13/02/26) nominating the eastern boundary of the covenant area to be fenced in accordance with condition 31 of the higher order approval (RAL19/0014), and include a gate for access to the covenant area via lot 8 to satisfy condition 25(ii) and provide access for the future ongoing management of the covenant. Page 6 of 9 Tod Job Number: 19660-OPW2-A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (19660 OPW26-0033 - response to info request.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.