19660 OPW26-0033 - response to info request
Response
As per our discussions and emails with Daniel Epps, we consider that the stormwater design
provided does comply with conditions 37 & 38 of the higher order approval. In addition, we have
checked Council's PSP for Stormwater design standards that apply and it refers to QUDM
(extract below - item 1 (a) (i)). QUDM requires urban drainage in low density areas to be
designed to convey Q2 (AEP 39%) - extract attached (table 7.3.1).
PLANNING SCHEME EXTRACT
QUDM EXTRACT
As such, the HGL shown on our long section drawings for a Q2 event is the correct design
event and confirms that the pits downstream of pit 6/A will not surcharge. We have removed
reference to surcharge pits on the long section which was a drafting error.
Page 5 of 9
Tod Job Number: 19660-OPW2-A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (19660 OPW26-0033 - response to info request.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.