19660 OPW26-0033 - response to info request
Information Required 13. Provide information to satisfy conditions 29 and 32, including, but not limited to: 13.1. Provide a detailed site rehabilitation management plan for the covenant area, prepared by a suitably qualified person. The plan must outline rehabilitation methodologies, areas of targeted regeneration planting (where required), weed management, vegetation protection measures, and monitoring and maintenance requirements to ensure long-term protection and ecological function of the covenant area, giving due consideration to the ecological assessment referenced in condition 29 of the higher order approval (RAL 19/0014). 13.2. A detailed Landscape Plan prepared by a suitably qualified person demonstrating proposed street-tree planting and landscaping of the bioretention basin in accordance with the Noosa Plan PSP2 Landscaping. In addition to the requirements of higher order condition 32 (RAL19/0014) the plan must address: • proposed species and locations • appropriate spatial setbacks from sewer and water infrastructure, • avoidance of conflicts with future driveway locations, • adequate soil volumes and soil depths to support long-term tree health, and measures to ensure the sustainable establishment and viability of all vegetation. Response The Covenant Rehabilitation Plan and Landscape Plan are currently being prepared and are expected to be available within the next few weeks. Note that these plans could not be finalised until amendments to the civil drawings had been completed. These documents will be forwarded to Council as soon as they become available. Issue 14 – vegetation retention within the road reserve The submitted plans indicate that clearing of existing vegetation within the road verge will be limited to the minimum necessary to undertake the proposed works. However, insufficient information has been provided to demonstrate that a thorough assessment has been carried out to identify vegetation that may be suitable for retention, nor have appropriate measures been proposed to ensure the protection of such vegetation during construction. Information Required 14. Provide an Arboricultural Impact Assessment (AIA) prepared by an AQF Level 5 qualified arborist in accordance with AS4970 Protection of trees on development sites, including: 14.1. A site survey identifying all trees within the road reserve, including the calculation and mapping of Tree Protection Zones (TPZ) and Structural Root Zones (SRZ) for each tree, spatially referenced to the proposed engineering works. 14.2. Identification of trees with potential for retention, based on tree health, structure, species, location, and anticipated construction impacts. 14.3. A detailed Tree Protection Plan, outlining all required protection measures for trees identified for retention during all stages of the development. The plan must include specifications for protective fencing, signage, soil-protection measures, monitoring protocols, and any special construction techniques or root-zone management required to minimise impacts. Page 8 of 9 Tod Job Number: 19660-OPW2-A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (19660 OPW26-0033 - response to info request.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.