Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

19660 OPW26-0033 - response to info request

of 9
Response
 As noted in item 12 above a tree survey has been completed by Brian Naismith Cadastral &
Engineering Surveying Consultant and these plans and tables have been included as part of
this response. Trees to be retained and removed have been added to the earthworks plans
including the TPZ’s of trees to be retained. Tree protection plans have been added to the civil
drawing set . As noted above, following discussions with Council it is proposed that the OPW
approval will include a condition requiring a tree protection plan prepared by a suitably qualified
arborist submitted to Council prior to pre start meeting.

We trust the above is satisfactory. Should you have any queries regarding this matter please
contact the undersigned.

Yours faithfully

Doug Reynolds
Doug Reynolds
Principal Civil Engineer
TOD Consulting Pty Ltd

07 5449 9600 | [email protected]
TOD consulting engineers




                                                                                            Page 9 of 9
                                                                         Tod Job Number: 19660-OPW2-A

Log in to download the original (19660 OPW26-0033 - response to info request.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.