                                                                                                1810-8094 SRA



Attachment 1—Conditions to be imposed


 No.      Conditions                                                                 Condition timing
 Material change of use
 10.9.4.2.4 State-controlled road —The chief executive administering the Planning Act 2016 nominates
 the Director-General of the Department of Transport and Main Roads to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following condition(s):
 1.       (a) The development must be carried out generally in accordance with       (a) prior to the
              the following shown on the Site Plan/Ground Floor Plan, prepared       commencement of use
              by And+ Design, dated July 2018, drawing number DA-16.0518.2
              as amended in red:                                                     (b) prior to obtaining
                The existing bus stop ‘Elm St at Cooroy Station, Cooroy’            development approval
                   (TransLink ID: 700540, Hastus ID: 301598) adjacent to the site    for operational work or
                   in Elm Street must not be relocated.                              building work,
                The existing bus stop shelter must be repositioned to the north     whichever occurs first
                   of the awning. Where the existing shelter cannot be reinstated,
                   a new disability compliant shelter must be provided in            (c) prior to the
                   accordance with Noosa Council’s requirements and Table 5.9        commencement of use
                   – ‘TransLink requirements for bus stop components – bus stop
                   furniture - shelters’ (page 38) of Chapter 5 – ‘Bus Stop
                   Infrastructure’ of the Public Transport Infrastructure Manual
                   2015.
                The existing bin must be repositioned to the south of the tactile
                   ground surface indicators. Where the existing bin cannot be
                   reinstated, a new bin must be provided in accordance with
                   Table 5.9 – ‘TransLink requirements for bus stop components
                   – bus stop furniture – bins’ (page 39) of Chapter 5 – ‘Bus Stop
                   Infrastructure’ of the Public Transport Infrastructure Manual
                   2015.

          (b) Written notice must be provided to the Department of Transport and
              Main Roads’ TransLink Division (07 3851 8700 or at
              [email protected]) prior to relocating the existing shelter
              and bin at the bus stop.

          (c) RPEQ certification must be provided to the North Coast District
              Development Assessment Team, via
              [email protected]. within the Department of Transport
              and Main Roads’, confirming that the development has been
              designed and constructed in accordance with parts (a), (b) and (c)
              of this condition.

 2.       (a) Stormwater management of the development must ensure no                (a) at all times
              worsening or actionable nuisance to the state-controlled road.
                                                                                     (b) at all times
          (b) Any works on the land must not:
                  (i) create any new discharge points for stormwater runoff onto     (c) Prior to the
                  the state-controlled road;                                         commencement of use
                  (ii) interfere with and/or cause damage to the existing
                  stormwater drainage on the state-controlled road;
                  (iii) surcharge any existing culvert or drain on the state-
                  controlled road;
                  (iv) reduce the quality of stormwater discharge onto the state-
                  controlled road .

          (c) RPEQ certification with supporting documentation must be provided


 Department of State Development, Manufacturing, Infrastructure and Planning                        Page 3 of 9
Log in to download the original file

1810-8094 SRA Response with conditions MCU18-0158.pdf · 363 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.