1810-8094 SRA Response with conditions MCU18-0158
Attached to the e-mail SARA Response with conditions - MCU18/0158.
1810-8094 SRA
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Material change of use
10.9.4.2.4 State-controlled road —The chief executive administering the Planning Act 2016 nominates
the Director-General of the Department of Transport and Main Roads to be the enforcement authority for
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following condition(s):
1. (a) The development must be carried out generally in accordance with (a) prior to the
the following shown on the Site Plan/Ground Floor Plan, prepared commencement of use
by And+ Design, dated July 2018, drawing number DA-16.0518.2
as amended in red: (b) prior to obtaining
The existing bus stop ‘Elm St at Cooroy Station, Cooroy’ development approval
(TransLink ID: 700540, Hastus ID: 301598) adjacent to the site for operational work or
in Elm Street must not be relocated. building work,
The existing bus stop shelter must be repositioned to the north whichever occurs first
of the awning. Where the existing shelter cannot be reinstated,
a new disability compliant shelter must be provided in (c) prior to the
accordance with Noosa Council’s requirements and Table 5.9 commencement of use
– ‘TransLink requirements for bus stop components – bus stop
furniture - shelters’ (page 38) of Chapter 5 – ‘Bus Stop
Infrastructure’ of the Public Transport Infrastructure Manual
2015.
The existing bin must be repositioned to the south of the tactile
ground surface indicators. Where the existing bin cannot be
reinstated, a new bin must be provided in accordance with
Table 5.9 – ‘TransLink requirements for bus stop components
– bus stop furniture – bins’ (page 39) of Chapter 5 – ‘Bus Stop
Infrastructure’ of the Public Transport Infrastructure Manual
2015.
(b) Written notice must be provided to the Department of Transport and
Main Roads’ TransLink Division (07 3851 8700 or at
[email protected]) prior to relocating the existing shelter
and bin at the bus stop.
(c) RPEQ certification must be provided to the North Coast District
Development Assessment Team, via
[email protected]. within the Department of Transport
and Main Roads’, confirming that the development has been
designed and constructed in accordance with parts (a), (b) and (c)
of this condition.
2. (a) Stormwater management of the development must ensure no (a) at all times
worsening or actionable nuisance to the state-controlled road.
(b) at all times
(b) Any works on the land must not:
(i) create any new discharge points for stormwater runoff onto (c) Prior to the
the state-controlled road; commencement of use
(ii) interfere with and/or cause damage to the existing
stormwater drainage on the state-controlled road;
(iii) surcharge any existing culvert or drain on the state-
controlled road;
(iv) reduce the quality of stormwater discharge onto the state-
controlled road .
(c) RPEQ certification with supporting documentation must be provided
Department of State Development, Manufacturing, Infrastructure and Planning Page 3 of 9