Appendix O - SDAP Code Responses (002)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

  Performance outcomes                                       Acceptable outcomes                                  Response
  PO3 Road, pedestrian and bikeway bridges over              AO3.1 Road, pedestrian and bikeway bridges           Not Applicable
  a state-controlled road are designed and                   over a state-controlled road include throw           No bridges over state-controlled roads are
  constructed to prevent projectiles from being              protection screens in accordance with section        proposed.
  thrown onto a state-controlled road.                       4.9.3 of the Design criteria for bridges and other
                                                             structures manual, Department of Transport and
                                                             Main Roads, 2014.
  Filling, excavation and retaining structures
  PO4 Filling and excavation does not interfere              No acceptable outcome is prescribed.                 PO4 Complies
  with, or result in damage to, infrastructure or                                                                 Filling will not interfere with any component of a state-
  services in a state-controlled road.                                                                            controlled road except where new access is created.

  Note: Information on the location of services and
  public utility plants in a state-controlled road can be
  obtained from the Dial Before You Dig service.

  Where development will impact on an existing or
  future service or public utility plant in a state-
  controlled road such that the service or public utility
  plant will need to be relocated, the alternative
  alignment must comply with the standards and design
  specifications of the relevant service or public utility
  provider, and any costs of relocation are to be borne
  by the developer.
  PO5 Filling, excavation, building foundations and          No acceptable outcome is prescribed.                 PO5 Complies
  retaining structures do not undermine, or cause                                                                 See response to PO4.
  subsidence of, a state-controlled road.

  Note: To demonstrate compliance with this
  performance outcome, it is recommended an RPEQ
  certified geotechnical assessment, prepared in
  accordance with Volume 3 of the Road Planning And
  Design Manual 2nd edition, Department of Transport
  and Main Roads, 2016, is provided.


State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                                  Page 2 of 21
Log in to download the original file

Appendix O - SDAP Code Responses (002).pdf · 212 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.