Appendix O - SDAP Code Responses (002)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

  Performance outcomes                                  Acceptable outcomes                                  Response
  PO6 Filling, excavation, building foundations and     No acceptable outcome is prescribed.                 PO6 Complies
  retaining structures do not cause ground water                                                             See response to PO4.
  disturbance in a state-controlled road.

  Note: To demonstrate compliance with this
  performance outcome, it is recommended an RPEQ
  certified geotechnical assessment, prepared in
  accordance with Volume 3 of the Road planning and
  design manual 2nd edition, Department of Transport
  and Main Roads, 2016, is provided.
  PO7 Excavation, boring, piling, blasting or fill      No acceptable outcome is prescribed.                 PO7 Complies
  compaction during construction of a                                                                        Proposed works will not cause damage to the state-
  development does not result in ground                                                                      controlled road.
  movement or vibration impacts that would cause
  damage or nuisance to a state-controlled road,
  road transport infrastructure or road works.

  Note: To demonstrate compliance with this
  performance outcome, it is recommended an RPEQ
  certified geotechnical assessment, prepared in
  accordance with Volume 3 of the Road Planning And
  Design Manual 2nd edition, Department of Transport
  and Main Roads, 2016, is provided.
  PO8 Development involving the haulage of fill,        AO8.1 Fill, extracted material and spoil material  PO8 Complies
  extracted material or excavated spoil material        is not transported to or from the development site The quantity of transported material will be managed
  exceeding 10,000 tonnes per year does not             on a state-controlled road.                        to ensure no damage is caused to state-controlled
  damage the pavement of a state-controlled road.                                                            roads.

  Note: It is recommended a pavement impact
  assessment is provided in accordance with the Guide
  to Traffic Impact Assessment, Department of
  Transport and Main Roads, 2017.
  PO9 Filling and excavation associated with the        No acceptable outcome is prescribed.                 PO9 Complies
  construction of vehicular access to a                                                                      See response to PO4.

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                          Page 3 of 21
Log in to download the original file

Appendix O - SDAP Code Responses (002).pdf · 212 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.