Appendix O - SDAP Code Responses (002)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

  Performance outcomes                                  Acceptable outcomes                                    Response
  development does not compromise the operation
  or capacity of existing drainage infrastructure for
  a state-controlled road.
  PO10 Fill material used on a development site         AO10.1 Fill material is free of contaminants           PO10 Complies
  does not result in contamination of a state-          including acid sulfate content.                        See response to PO4.
  controlled road.
                                                        Note: Soils and rocks should be tested in accordance
                                                        with AS 1289.0 – Methods of testing soils for
                                                        engineering purposes and AS 4133.0-2005 –
                                                        Methods of testing rocks for engineering purposes.
                                                        AND
                                                        AO10.2 Compaction of fill is carried out in
                                                        accordance with the requirements of AS 1289.0
                                                        2000 – Methods of testing soils for engineering
                                                        purposes.
  PO11 Filling and excavation does not cause            AO11.1 Compaction of fill is carried out in            PO11 Complies
  wind-blown dust nuisance in a state-controlled        accordance with the requirements of AS 1289.0          Dust nuisance will be appropriately managed through
  road.                                                 2000 – Methods of testing soils for engineering        a construction-management plan.
                                                        purposes.
                                                        AND
                                                        AO11.2 Dust suppression measures are used
                                                        during filling and excavation activities such as
                                                        wind breaks or barriers and dampening of
                                                        ground surfaces.
  Stormwater and drainage
  PO12 Development does not result in an                No acceptable outcome is prescribed.                   PO12 Complies
  actionable nuisance, or worsening of,                                                                        See Appendix G – Stormwater Management Report.
  stormwater, flooding or drainage impacts in a
  state-controlled road.
  PO13 Run-off from the development site is not         AO13.1 Development does not create any new             PO13 Complies
  unlawfully discharged to a state-controlled road.     points of discharge to a state-controlled road.        See Appendix G – Stormwater Management Report
                                                        AND

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                            Page 4 of 21
Log in to download the original file

Appendix O - SDAP Code Responses (002).pdf · 212 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.