3.3 EROSION CONTROL
• Soil materials will be replaced in the same order they are removed from the ground. It is particularly
important that all subsoils are buried and topsoils remain on the surface at the completion of works.
• While C-factors are likely to rise to 1.0 during the works program, they should not exceed those given in
Table 3 in the long term. The requirement of Table 3 can be achieved as follows.
In areas of sheet flow, with a temporary vegetative cover and a suggested listing of suitable plant
species as shown in Table 4 (note, these plants only protect the ground surface for up to six months).
The area can be sprayed with a soil binder for protection up to 3 months duration using Terra-
Control® or equivalent.
In areas of concentrated water flow, with 3S0 gsm jute matting or equivalent.
• Lands recently established with grass species will be watered regularly until an effective cover has
properly established and plants are rapidly growing. Further application of seed might be necessary later
in areas of inadequate vegetation establishment.
• Where practical, foot and vehicular traffic will be kept away from all recently stabilised areas.
• Earth batters shall be constructed with as low a gradient as practical
• All earthworks, including waterways/drains/spillways and their outlets, will be constructed to be stable in
at least the 10-year ARI storm event.
• During windy weather, large, unprotected areas will be kept moist (not wet) by sprinkling with water to
keep dust under control.
Table 3 - Maximum Acceptable C-Factors
Land Use Limitation Comments
Waterways and other areas 0.05 Applies after ten working days from
subjected to concentrated completion of formation and before they
flows, post construction are allowed to carry any concentrated
flows. Foot and vehicular traffic will be
prohibited in these areas (70% ground
cover)
Stockpiles, post 0.10 Applies after ten working days from
construction completion of formation. Maximum C-
factor of 0.10 equals 60% ground cover.
All lands, including 0.15 Applies after 20 working days of inactivity,
waterways and stockpiles even though works might continue later.
during construction Maximum C-factor of 0.15 equals 50%
ground cover.
SOIL AND WATER MANAGEMENT PLAN - Revision A 71 Seaview Terrace. Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.