Skip to the record
Beware of cheap imitations.

Council archive · source document

2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

      •    Sand/ soil/ spoil materials placed closer than 2 metres from hazard areas will be removed. Such hazard
           areas include any areas of high velocity water flows, paved areas and driveways.
      •    Recently stabilised lands will be checked to ensure that the erosion hazard has been effectively reduced.
           Any repairs will be initiated as appropriate.
      •    Excessive vegetative growth will be controlled through mowing or slashing.
      •    Any pollutants removed from sediment devices or litter traps will be disposed in areas where further
           pollution to downstream lands and waterways should not occur.
      •    Additional erosion and /or sediment works will be constructed if necessary to ensure the desired
           protection is given to downstream waterways i.e. ongoing changes to the SWMP where it proves
           inadequate in practice or is subjected to changes in conditions at the work site or elsewhere in the
           catchment.
      •    Erosion and sediment control measures will be maintained in a functioning condition until all earthwork
           activities are completed and the site stabilised.

5.2       WATER QUALITY MONITORING

The upper limit of 50mg/L for the discharge of total suspended solids has been adopted from Maroochy Shire
Council's 'Manual for Urban Erosion and Sediment Control', December 2007.


The Maroochy Shire Council guidelines state the 50mg/L limit is to be sensibly enforced with exceedance of this
limit generally classified as a failure in the erosion and sediment control design or operation and maintenance. If
the upper limit is exceeded, Sunshine Coast Regional Council shall be notified in order to identify and present
feedback on problems within the design and maintenance procedure.




 SOIL AND WATER MANAGEMENT PLAN - Revision A                                   71 Seaview Terrace, Sunshine Beach

Used in these records

About this file

File size
31.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2008_0169 Response to information request - 71 Seaview Tce Sunshine Beach.pdf · 31.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.