To ensure scour will not occur at the outlet of the drain and pipe system, scour protection will be implemented.
This will include a 100mm concrete base with large boulders, river rock and plantings to be implemented to
dissipate velocities and ensure flows will spread prior to ultimate discharge off site. Details of the proposed scour
protection and spreading of flows is shown in Figure 7.
VOIDS TO BE PLANTED WITH RUSH/REED
SPECIES (SUBJECT TO LANDSCAPE
DESIGN)PLANTING HOLES CUT WITHIN
GEOTECTILE ARE TO BE APPROXIMATELY 1/3
LARGER THAN PLANT STEM DIAMETER.
`P
POTENTIAL 1 IN 2
BATTER ROCK OR
BOULDER PLACEMENT
AND PLANTINGS
TYPICAL HEADWALL BOULDER / GRAVEL PLACEMENT AND PLANTING
NTS
PRE-CAST HEADWALL
5m min
LARGE BOULDER DIA DIRECTLY
PROPORTIONAL TO DIAMETER
OF PIPE AT OUTLETIINLET.
EMBEDED 75mm INTO MORTOR
1 j- 200 to 300 BOULDER/RIVER ROCK
0
1INg
0
0 I O
150 DEPTH OF WASHED RIVER
GRAVEL 75 TO 100mm DIA X100 THICK CONCRETE
MORTOR
SECTION A - A
NTS
Figure 7 - Drain Outlet Details
SITE BASED STORM WATER MANAGEMENT PLAN - Revision D 71 Seaview Terrace, Sunshine Beach 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.