4.0 WATER QUANTITY- PROPOSED DEVELOPME
4.1 INTRODUCTION
The Rational Method has been used to calculate the peak stormwater runoff flow rates for the pre and post
development sites for all ARI (Annual Recurrence Interval) from the 1 year to 100 year event. Appendix B provides
detailed Rational Method calculations.
4.2 CATCHMENTS
For the pre and post development scenario a contributing catchment area of 2,620m2 was determined and has
been used in all flow calculations. The catchment corresponds to the potential impervious area proposed for the
development. The catchment plan is shown below in Figure 8.
Figure 8 - Site Potential Impervious Area
4.3 CO-EFFICIENT OF RUN OFF
For the Pre Development scenario a C10 value of 0.70 (fraction impervious of 0.00) was assumed from Table 4.05.3
(b), QUDM, 2nd Edition, 2007. For the Post Development scenario a C10 value of 0.90 (fraction impervious of 1.00)
was assumed from Table 4.05.3, QUDM, 2nd Edition, 2007
SITE BASED STORMWATER MANAGEMENT PLAN - Revision D 71 Seaview Terrace. Sunshine Beach 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.