12kL TANK
i
nll III:)II t'II: ll. 1t1Ht
u '.... II II:U aI I. 7
24kL TANK
Figure 9 - Preliminary Tank Location
4.8 FLOWS MIGITATED
The outflow from the storage system determined utilising the XP-SWMM software is shown below for a range of
storm events. The system was analysed as a single 40m2 tank with a maximum depth of 1.5m. The outlet from
the analysed tank consists of two staged outlets:
• 2 x 1500 pipes at the invert of the tank (110 - 110 L/sec Q100 flow, 2.59m/s velocity)
• 2 x 1500 pipes at 0.7m above the invert of the tank (70 - 80 L/sec Q100 flow, 1.79m/s velocity)
SITE BASED STORMWATER MANAGEMENT PLAN - Revision D 71 Seavlew Terrace. Sw1shum Beach 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.