L L
Outlet scour protection and energy dissipation structures, similar to Figure 7 will be provided. The 150mm outlet
pipes will not warrant a rock apron Sm long, a rock apron 2m in length will be more than sufficient to provide
effective scour protection. The rock apron will dissipate a great deal of energy from stormwater outflows and as
such discharge onto existing vegetation will not be harmful. The scour and energy dissipation capabilities of the
outlet structure are in accordance with Section 8.06 of QUDM and Healthy Waterways Guidelines. Partially buried
or depressed pipe outlets can also be utilised to dissipate velocity at these outlets. The Q100 flows also represent
a storm event that occurs on average once in every 100 years which is an extremely rare event. Final tank and
outlet size is to be determined at the operational works stage of the application.
Ideally the majority of all stormwater runoff will discharge to the storage system to reduce the number of outlets
from the site and scour possibilities due to the steep topography. The XP-SWMM model has assumed that runoff
from all impervious areas will discharge into the storage system. It is unlikely that all impervious area will be able
to discharge to the onsite detention system. Stormwater storage requirements for the site are not highly
dependent on the inflow to the storage device and a storage requirement of 60kL is reasonable if at least 50% of
the impervious area discharges to the storage system.
fable 7 - Outflow from Storage System
Q1 Q2 Q5 Q10 Q20 Q50 Q100
Scenario ( (m3 (m3
m3/s) /s) /s) (m3/s) (m3/s) (m3/s) (m3/s)
Inflow 0.068 0.091 0.125 0.146 0.174 0.212 0.234
Allowable Outflow 0.048 0.065 0.089 0.103 0.124 0.156 0.180
Actual Outflow 0.048 0.055 0.069 0.097 0.124 0.149 0.161
Non- Worsening YES YES YES YES YES YES YES
Detailed XP-SWMM Results are attached in Appendix D.
4.9 TREATMENT OF DRIVEWAY / CARPARK RUNOFF
All runoff from the driveway / carpark area will be directed to the north. All stormwater runoff from the driveway
/ carpark area will be captured and treated through a Fox Environmental Systems: Baffled Gross Pollutant Trap -
Model BPT600 (or approved equivalent). The device is to be located in the north-western corner of the driveway.
The GPT will capture silt, organic matter, floating debris and hydrocarbons attached to suspended solids.
Additional pits may be required upstream where additional treatment devices will also be required.
Runoff from the carpark will be directed to the proposed storage devices. A preliminary location of the GPT device
is shown in Figure 10 and the actual location will be determined at the operational works stage.
SITE BASED STORMWATER MANAGEMENT PLAN - Revision D ' 1 Seaview Terrace, Sunshine Beach 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.