Council archive · source document
2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169
Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
TOO ;NSULTINC
Table of Contents
1.0 Summary 3
2.0 Introduction 4
3.0 Project Description 4
3.1 Scope 4
3.2 General 5
3.3 Site Conditions 5
3.4 Construction Management Plan 5
3.5 Construction of Retaining Walls and Excavation 7
4.0 Design Loading Criteria 8
4.1 General 8
4.2 Codes and Specifications 8
4.3 Loading Criteria 9
4.4 Deflection Criteria 10
5.0 Materials Specification 11
5.1 Concrete II
5.2 Reinforcing Steel I1
5.3 Formwork II
5.4 Structural Steel 11
6.0 Structural Framing System I1
6.1 General Structural System 11
6.2 Lateral Resistance 12
6.3 Drainage 13
7.0 Pool/Terrace Building
7.1 General Structural System 14
7.2 Lateral Resistance 15
7.3 Drainage 15
Appendix MCU Tod Consulting Drawing List
09578 - P1 MCU Works General Notes
P2 MCU Works General Notes
P3 MCU Works Locality Plan Drawing Schedule
P4 MCU Works Site Plan Access
P5 MCU Works Bulk Excavation & Piling
P6 MCU Works Site Sections
P7 MCU Works Construction Procedure
P8 MCU Works Construction Detail
P9 MCU Works Excavation Plan
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.