TODCONSULTING
footings are to be founded into very dense sands, stiff clays or weathered
sandstone, at least 5m below any 27° sand slip line projected from the base of the
slope, and at least 7m below existing ground line, whichever is deeper. Piled
footings may need to be founded deeper than these levels depending on
excavation depth and pile loads.
2.0 Introduction
The following design criteria details the required structural performance criteria
for the proposed residence. It establishes the overall structural performance
requirements along with a series of minimum standards for specific design and
construction technical controls of the works.
Reference Documentation:
• Site Survey Drawings by Lawrence & Partners
• Gavin Maddock Design Architectural Drawing 180 Sk206
Sk207
Sk208
Sk209
Sk210
Sk217
Sk220
• Geotechnical Reports by SCG dated 24.3.09 and Morrison Geotechnical dated
September 2009.
3.0 Project Description
3.1 Scope
The work covers the entire main house building structure including but not
limited to CFA (Continuous Flight Auger) concrete and galvanised screw
steel piled footings, slabs on ground, retaining walls, external pavements,
temporary and permanent structural steel wall strut framing, structural
steel supports for claddings, block walls, suspended floors, roofs,
walkways, stairs and other minor structural items.
Fully piled and laterally restrained foundations support the
bedroom/terrace/pool building built on a steeper section of sand dune
towards the eastern boundary. This design will be quite stable and capable
of withstanding possible on-going downhill slippage of the loose surface
sands.
Item 7.0 below provides a more detailed outline of our proposed design
for the pool/terrace building.
A significant component of the project is the construction of the
contiguous piled retaining structures which shall be horizontally strutted
during excavation by the "top-down" method of constructing the roof slab
first, and/or using temporary or permanent diagonal steel struts down to
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.